DV-989AVi-S
105
5
7
8
5
7
8
C
D
F
A
B
E
7.1.10 DISASSEMBLY
Gear Pulley
05 LOADER Assy
Mechanism Cover
Loadig Base
1
Remove the bonnet by removing the fifteen screws.
2
Press the
POWER button to turn on the power.
3
Press the
0
OPEN/CLOSE button to open the tray.
4
Remove the tray panel.
5
Press the
0
OPEN/CLOSE button to close the tray.
6
Press the
POWER button to turn off the power.
Bonnet and Tray Panel
1
Diagnosis of the PCBs
1
Remove the six screws.
2
Remove the three screws.
3
Disconnect the one connector and one flexible cables.
Remove the front panel section.
Front Panel Section
2
2 6
3
3
5
5
4
1
4
Tray panel
Tray
1
1
1
2
2
2
1
1
4
4
Bottom view
Front panel section
3
CN402
5
Note 1 :
Even if the unit shown in the photos and illustrations in this manual may differ from your product, the procedures
described here are common.
Note 2 :
For performing the diagnosis shown below, the following jigs for service are required:
• 17P flexible cable for service (GGF1157) • Extension board (GGF1430)
CN2301
3
How to open the tray when the power cannot be on.
Tray open
Gear Pulley
LOADER Assy
Mechanism Cover
Loading Base
Turn the gear pulley clockwise as indicated. In the photo when the
tray opens a little, pull out by hand.
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299