Commissioning
Operating Manual PIT gb
1004627-EN-04
| 25
7
Commissioning
7.1
Connection to evaluation device
Suitable Pilz evaluation devices for the actuation of the LED and reading out all control ele-
ments include:
}
PNOZmulti
}
PSSuniversal PLC
Suitable Pilz evaluation devices for the evaluation of the E-STOP:
}
PNOZelog
}
PNOZsigma
}
PNOZ X
The correct connection to the respective evaluation device is described in the operating
manual for the evaluation device. Make sure that the connection is made in accordance
with the specifications in the operating manual for the selected evaluation device.
7.2
Function test
Once the unit has been installed and aligned, final inspections must be carried out before it
can be put into service.
INFORMATION
This inspection may only be carried out by qualified personnel.
}
Always test the function with a connected evaluation device.
}
Check the function of the E-STOP.
}
Check the function of the other control elements.