COMMISSIONING
|
REV. A
Operation, maintenance and warning manual
8.4.4 - COMMISSIONING OF THE OPD AND DUAL CUT VERSION REGULATOR
For commissioning the OPD and Dual Cut (A) versions, proceed as shown in Tab. 8.54.:
Step
Operation
1
Partially open the downstream vent tap when present.
2
Slowly open upstream shutoff devices (e.g. OPSO block valve, valve (B), etc...).
3
Wait for the downstream pressure to stabilize at the spring setting P2 indicated on the plate.
Refer to Section 2.8 "Identification plates applied" et seq. for the values on the identification
plate.
4
Close the vent tap.
Tab. 8.54.
B
A
C
D
Fig. 8.29. Commissioning (OPD and Dual Cut versions)
8.5 - VERIFICATION OF PROPER COMMISSIONING
Check the tightness of the connections made during equipment installation (refer to Chapter 6 "Installation") through a