© 2017 Pierce Manufacturing Inc. All Rights Reserved.
Husky 12 Foam System
/ 3-3
OPERATION
3-1.4
Class B Foam - Drafting
Figure
3-4:
Control Head in Class B Drafting Mode
1556
1.
Set up for drafting operation by positioning foam and hooking up pick-up hose.
2.
Press the PAGE button until the DRAFT CLASS B screen appears, then press ENTER. On-board tank valves
will close, causing suction to draw from foam inlet.
NOTE:
An automatic pre-programmed flush of 10-15 seconds will occur when changing from Class A to
Class B foam, once the water flowmeter senses water flow.
3.
The default percentage will remain the same as the on-board Class B tank current setting.
4.
Use the ARROW UP / ARROW DOWN buttons to change percentage
(if needed)
.
5.
See
“General Flushing Information”
.
Содержание HUSKY 12 GPM
Страница 2: ......
Страница 6: ...TABLE OF CONTENTS iv Husky 12 Foam System 2017 Pierce Manufacturing Inc All Rights Reserved ...
Страница 8: ...FOREWORD vi Husky 12 Foam System 2017 Pierce Manufacturing Inc All Rights Reserved ...
Страница 34: ...OPERATION 3 12 Husky 12 Foam System 2017 Pierce Manufacturing Inc All Rights Reserved ...