![Pierce HUSKY 12 GPM Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/pierce/husky-12-gpm/husky-12-gpm_operation-and-maintenance-manual_1555697024.webp)
OPERATION
3-2
/ Husky 12 Foam System
© 2017 Pierce Manufacturing Inc. All Rights Reserved.
3-1.2
Class A Foam - Drafting
Figure
3-2:
Control Head in Class A Drafting Mode
1555
1.
Set up for drafting operation by positioning foam and hooking up pick-up hose.
2.
Press the PAGE button until the DRAFT CLASS A screen appears, then press ENTER. On-board tank valves
will close, causing suction to draw from foam inlet.
3.
The default percentage will remain the same as the on-board Class A tank current setting.
4.
Use the ARROW UP / ARROW DOWN buttons to change percentage
(if needed)
.
5.
See
“General Flushing Information”
.
3-1.3
Class B Foam - Using On-Board Foam Tank
Figure
3-3:
Control Head in Class B Foam Mode
1554
NOTE:
This operation is only possible when the Class B foam tank is installed and enabled.
1.
Press the PAGE button until the CLASS B FOAM screen appears, then press ENTER. The Class A foam valve
will close; an automatic flush will occur prior to the Class B valve opening, provided the water flowmeter senses
water flow.
2.
Use the ARROW UP / ARROW DOWN buttons to change percentage
(if needed)
.
3.
See
“General Flushing Information”
.
During the automatic flush, water must be flowing through an open foam discharge OR open manifold
drain to give the flush solution somewhere to go.
Содержание HUSKY 12 GPM
Страница 2: ......
Страница 6: ...TABLE OF CONTENTS iv Husky 12 Foam System 2017 Pierce Manufacturing Inc All Rights Reserved ...
Страница 8: ...FOREWORD vi Husky 12 Foam System 2017 Pierce Manufacturing Inc All Rights Reserved ...
Страница 34: ...OPERATION 3 12 Husky 12 Foam System 2017 Pierce Manufacturing Inc All Rights Reserved ...