4. Make sure that the contact resistance is <0.1
Ω
at 25 A at all points relevant for attaching
the protective earth conductor.
5. If there is any vibration in your application, secure the screw connection for the protective
earth conductor in a suitable manner (e.g., with liquid adhesive) to prevent it from
unscrewing by itself.
6.3
Mounting the Load
NOTICE
Impermissibly high load on the L-417.xx9025E1
An impermissibly high load on the L-417.xx9025E1 impairs the motion and can damage the
L-417.xx9025E1.
►
Pay attention to the
maximum permissible forces (p. 30)
that may act on the
L-417.xx9025E1.
►
In the case of multi-axis systems, include the masses of the positioners to be moved
when calculating the load.
NOTICE
Excessively long screws and locating pins
Screws and locating pins that are inserted too deeply can damage the L-417.xx9025E1.
►
Pay attention to the depth of the mounting and locating holes.
►
Only use screws and locating pins of the correct length for the respective mounting holes.
Overview
Figure 9: Mounting the load onto the L-417.xx9025E1
Tools and Accessories
■
At least 3 screws with suitable
■
Suitable tool for tightening the screws
■
Optional: 2 suitably dimensioned dowel pins as locating pins for aligning the load on the
L-417.xx9025E1
Requirements
✓
You have read and understood the
general safety instructions (p. 8)
6 INSTALLATION
L417UM0002EN
‒
10/25/2022
20
M O T I O N | P O S I T I O N I N G