Instruction Manual
CESSNA AWAGON
9
54
55
56
57
58
59
60
Install the metal connector into the landing gear.
Install the landing gear to the fuselage.
Secure the plastic cover for the landing gear.
Install the elevator control horn same as installing the aileron
linkage.
Attach the clevis to the elevator pushrod.
Insert the silicone tube into the clevis.
Remove the covering.
1
5
Installing the elevator pushrod: