![Phoenix Mecano wiener PL508 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/phoenix-mecano/wiener-pl508/wiener-pl508_service-manual_1552049022.webp)
14. Dezember 2015
17
Water Interconnection Revision
6.
C
HECKUP
,
F
RONT AND
R
EAR CLOSING
After completing all modification steps it is recommended to close the back
and front cover vice versa you opened it. Take care not to squish wires!
While working overlook critical edges for wires and tubes, be aware of
pinching wires or damage something else. Due you don’t have the
resources and capabilities of our manufacturing base – you won’t be able to
fix or exchange damaged parts by your own.
Make a checkup. Therefore, here is a list with common issues. You may
draw up a check protocol for each unit to improve your Quality. It doesn’t
take much time to do this and helps to prevent unnecessary work, repairs
and – worst case – RMA / shipment to
W-IE-NE-R
or our contractor.
After attaching the front before closing the Unit checkup at least the
following points for flawless condition:
•
pinched wires / tubes
•
Improper strain on any part / wire / tube
•
Plug-In-Depth of the tubes (marking)
•
Insulation Cards back in Place
•
Correct tube circuitry, no dead loops
•
Insulation tubes are in correct position (rectifier)
Critical Points
Rectifier insulation tubes
Flat wire vs. PCB,
Mains wiring to rectifier vs. MNE