6. Installation
6.1
Safety notices to observe during installation
Basic safety rules must be followed in order to ensure that the end product can be continually ope-
rated in a safe manner. These rules must be observed while using the end product and while instal-
ling the MC11 control unit.
6.1.1
Avoiding electrical faults
The power supply cord is designed to be connected to an outlet near the floor. Be sure to consider
the length of the power cord when designing the dimensions for your application in order to minimi-
ze the associated risks.
6.1.2
Ensuring operational reliability during installation
The safety and reliability of the end product containing DewertOkin components can be ensured by
using the proper construction methods as described below.
Overheating
A thermal monitoring mechanism switches the MC11 control unit off if it overheats.
CAUTION
The MC11 control unit is equipped with a thermal monitoring mechanism that triggers
when the unit overheats. If the temperature control has triggered, remove the control
unit from the power supply, allow it to rest for 20 to 30 minutes and try again. If the con-
trol unit still does not function, please contact your supplier or sales agent.
Installation dimensions for the MEGAMAT MLZ drive
The installation length of the MEGAMAT MLZ drive should not be less than 291 mm (installation
length of MEGAMAT MLZ drive together with standard clevis). The drive or drive control unit could
be mechanically damaged if the installation length is shorter than this.
Mechanical construction
A shield covering the sockets protects the connections from mechanical damage and accidental
unplugging.