background image

Содержание PM2120

Страница 1: ...ower Resistive load Max common mode voltage between any two terminals and between any terminal and the System 21 bus Supply voltage Supply current User 1 0 terminal Relay SIYilching time Time from matching the execution condition to all relays settled Settling time after power on Make before break switching time Break before make switching time 60dB DC to 1OOkHz R0 500 0 5Q 1o9o 1o9o DC to 100kHz ...

Страница 2: ...s with one common contact per pair default mode Syntax MO Cn On MO Cn On Mode selection optional Close channel n Open channel n Functional diagram 6 4 2 n 0 19or n n1 n2 where O n1 n2 19 eg CB 12 means close switch 8 up to and including 12 Note Default all switches are open Also after reset command Rt 0 J channel number rear plug J channel number Mode 1 10 change over switches make before break Mo...

Страница 3: ...Send execution mode Send dump data Send identification of module Send operating mode funct cmd Store functional commands on n 0 19 block memory position n R Send ready line control mode RO Reset as after power on R1 Reset as after mode change R2 Clear block scan memory S Send status T n n 0 1 Functional test n X Execute luB n Initiate block operation up to n 0 19 and including block memory positio...

Страница 4: ...data example ready line control enable xecute n onditional Displays shows switch settings mode 0 First switch of display sequence open closed closed open Position First switch of 7 display sequence A 6 5 A B 1 See System 21 Manual MODE IN OUT Display shows switch settings mode 1 mode 2 4 Switch number A Position ...

Отзывы: