Draft - 1 Aug 08
Testing Transceiver Functionality
4-12
Basic Operation
Status
Check
You can check the status of the transceiver indicators at any time.
Initiating a
Status Check
Step
Action
1
Press the
Check
button.
The following indicators should illuminate for as long as the Check
button is depressed.
•
Battery gauge
•
Leads Off indicators
•
EASI (if in use)
2
If one or more of the expected indicators do not light up, check the
following:
•
Power and position of batteries (see “Checking the Battery
Power Level” on page 4-17).
•
Leadset insertion. Make sure the leadset is correctly inserted
in the transceiver and the colored line at the base of the cable
is not visible (see “Connecting the ECG Cable” on page 6-
21).
•
Lead positions and connections (see “Verifying Electrode
Connections” on page 6-25).
If there is still a problem, contact your service provider for
assistance.
Содержание IntelliVue TRx
Страница 6: ...Draft 1 Aug 08 About this Book vi ...
Страница 40: ...Draft 1 Aug 08 Accessories 2 18 Product Safety ...
Страница 54: ...Draft 1 Aug 08 Audible Tones 3 14 Transceiver Controls ...
Страница 74: ...Draft 1 Aug 08 Battery Information 4 20 Basic Operation ...
Страница 94: ...Draft 1 Aug 08 Technical Alarms INOPs 5 20 Alarms ...
Страница 152: ...Draft 1 Aug 08 How the QT Analysis Algorithm Works 7 24 ST AR Arrhythmia Monitoring ...
Страница 176: ...Draft 1 Aug 08 Optimizing SpO2 Measurement Performance 8 24 SpO2 Monitoring ...
Страница 236: ...Draft 1 Aug 08 Troubleshooting 11 16 Maintenance Cleaning Troubleshooting ...
Страница 268: ...Draft 1 Aug 08 SpO2 Accessories A 10 Accessories ...
Страница 270: ...Draft 1 Aug 08 B 2 Sales and Support Offices ...
Страница 274: ...Draft 1 Aug 08 Index 4 ...