background image

9.

5/6.

7/8.

10/11.

Central Position

45 mins

30mm Nut

30mm Nut

Spirit Level Co.

Beam shown
to be level

Receiver

Receiver

Transmitter

Transmitter

60 5

10

15

20

25

30

35

40

45

50

55

in

Parking and access control equipment manufactured in the UK

Automatic Sliding Gates

Component Identification & Notes

6

5.

 Manually slide the gate back into the central “balanced” position taking care

not to move the tower or rear wheel support base plate.

6.

 Finish bolting down the rear support wheel base-plate and the main tower of the gate

making sure that it is true and square in both directions.

7.

 Slide the gate until the centre of the lower main beam is in the centre of the rear support wheels and the 

centre of the main tower i.e. have the lower main beam supported centrally by the rear support wheels 
and the drive rollers.

8.

 Undo the 30mm nuts that lock the cantilever arm adjuster to relax the cantilever arm and leave the gate 

in an unstressed state.

9.

 Placing a level on the centre of the lower beam or lower rail, adjust the rear wheel support until the 

lower main beam is level. Manually pull the gate closed and adjust the cantilever until the gate is level.

10.

 Using a laser square or similar, make sure the photo-cells from the Main Gate Housing to the Catch 

Post line up (this should be already level as it is governed by the plinth levels).

11.

 Now fit the two photo cells provided in the pre drilled holes and connect using the wiring diagram 

(page 8). Once the Photo Cells have been connected, complete the installation of the Catch Post using 4 
x M16 fixing bolts (supplied) making sure that it is true and square.

12.

 Now most important of all, you must fit the rear roller as shown (under the parts list on the previous 

page), which is universal in the way it can be fitted. It can either be used as a “cast in” post, or the bottom 
strut can be cut off and used as a “bolt down” roller all illustrated below.

12.

Bolt down or cast
the rear roller in this
position shown.

Cut along this line to
remove the bottom 
spiggots and shaft.

Once the shaft is
removed you will
use the M16 bolts
to fix down.

Before you can bolt
the part down you
have to remove this
roller by un-doing
the nuts either side
as shown.

Содержание ORIGEN ESP ESP9000

Страница 1: ...ntrol equipment manufactured in the UK ESP9000 Automatic Sliding Gate Rev 8 0 Manual Barriers Auto Sliding Gates Auto Bi Fold Gates Auto Rising Kerbs Turnstiles Auto Rising Bollards Installation Operation Maintenance Manual ...

Страница 2: ...NG CLOSING POSITIONS 09 GATE USAGE 10 PARAMETER LIST 11 TROUBLESHOOTING GUIDE 12 13 WIRING DIAGRAM 14 QUICK CONNECTION GUIDE 15 MASTER SLAVE WIRING 16 WIRING PROGRAMMING 17 20 LOOP DETECTOR SETTINGS 21 22 TROUBLESHOOTING GUIDE 23 24 POTENTIAL SYSTEM HAZARD AREAS 25 HANDING FORM 26 INSTALLATION COMMISSIONING CHECK LIST 27 SERVICE LOG 28 COMMISSIONING CERTIFICATE 29 DECLARATION OF CONFORMITY 30 ELEC...

Страница 3: ...ctured for the use specified in the present documentation Any other use not specified in this documentation could damage the product and be dangerous The Company declines all responsibility for any consequences resulting from improper use of the product or use which is different from that expected and specified in the present documentation Do not install the product in explosive atmosphere The constru...

Страница 4: ...uthorities LA working in partnership The project aims to reduce injuries and ill health arising from the movement of goods from supplier through haulier to the recipient and end user including any home deliveries The project will focus upon the delivery and collection of goods and the hazards this generates It covers the main areas that cause the majority of injuries and ill health to workers incl...

Страница 5: ...posite side to the hole used on the main tower see below 4 Manually slide the gate into the closed position to fine tune the alignment of the gate with the catch post See Page 6 for details on Manual Release The numbers in the text document below relate to the drawings below You should check that you have received the following in your order as they are referred to throughout this manual note this ...

Страница 6: ...am or lower rail adjust the rear wheel support until the lower main beam is level Manually pull the gate closed and adjust the cantilever until the gate is level 10 Using a laser square or similar make sure the photo cells from the Main Gate Housing to the Catch Post line up this should be already level as it is governed by the plinth levels 11 Now fit the two photo cells provided in the pre drille...

Страница 7: ...ly clean the photocell optical components and make sure they are free from dirt water rain soil etc Ÿ Have a qualified technician installer check the correct setting of the electric clutch Ÿ If the power supply cable is damaged it must be replaced by the manufacturer or its technical assistance service or else by a suitably qualified person in order to prevent any risk Ÿ When any operational malfunc...

Страница 8: ...ess and HOLD the stop key for 3 seconds to save the position 9 Now the display will change to e i e o 10 Using the up arrow move the gate to the open position double check and move to step 11 you have to hold the button in to move similar to deadman mode 11 Now you are happy with the open press and HOLD the stop key for 3 seconds to save the position 12 The display will show this denotes that the ...

Страница 9: ... the outside of the gate cabinet it will always be on the opposite side to the gate arm also picture shows the key switch keys 2 To move the gate using the arrow keys on the panel first make sure the screen says e o end position open or e c end position closed if it does not follow the troubleshooting guide on page 11 when the screen does say e o or e c follow below 3 To make the gate move to open...

Страница 10: ...isplay show the number you require figure 3 using the command buttons figure 2 when the display shows the parameter number required in the first column of the table below press the STOP button for one second You are now in that selected parameter should you wish to leave this parameter or discard any changes simply press the STOP button again for 1 second ONLY To make any adjustments in the select...

Страница 11: ...hotocells p 450 300 Increases the lag error detection time p 438 50 Increases the rotation direction error time p 352 15 Speed for start of close p 350 25 Speed for close p 312 15 Speed for start of open p 310 25 Speed for open p 216 1 Prevents the gate re learning it own parameters p F00 0 Turns off Wireless Safety Edge System 1 Follow the guide on page 10 to enter the menu 2 Scroll to parameter ...

Страница 12: ...nterrupted starting at Input 2 F 320 Obstacle during opening During opening an obstacle has recognized F 325 Obstacle during closing During closing an obstacle has recognized F 360 Short circuit detected on edge input Short circuit detected on edges with normally closed contact F 400 Controller hardware reset detected Excessive noise on supply voltage Internal watchdog tripped RAM error F 410 Over...

Страница 13: ...isturbed N C safety edge I 363 Disturbed N O safety edge I 510 Correction drive finished I 515 Active correction drive I 520 Pre set speed for open or close drive not reached I 555 Measuring rotation factor not ready E 000 Open on Keypad pressed Stuck button or cable not connected correctly E 050 Stop on Keypad pressed Stuck button or cable not connected correctly E 090 Close on Keypad pressed Stu...

Страница 14: ...Wiring Diagram in Parking and access control equipment manufactured in the UK Automatic Sliding Gates 14 ...

Страница 15: ...le without having to open the control panel cover see below for info Please NOTE that you will have to enable the corresponding parameters to activate the inputs as they are disabled in factory when testing the gates The terminal block is GREEN in colour NOTE You Must enable the following parameters P 507 0501 P 506 0501 Photocell Photocell Photocell Photocell ...

Страница 16: ... 8 2 2 8 8 1 1 Yellow Brown Yellow Brown Yellow Brown Grey Grey Grey Blue Blue Blue Blue Master Master Catch Post Slave Wire to main panel IN 7 Terminals 86 85 84 On Both Panels enable P 507 0501 P 506 0501 86 85 84 83 82 81 Brown Blue 4 3 2 4 3 2 3 wires only Wire in Series to master Terminals 85 86 Yellow and Grey from slave Link between terminals 85 86 and 82 83 Yellows from Slave Photocells Gr...

Страница 17: ...Wireless Encoder in Parking and access control equipment manufactured in the UK Automatic Sliding Gates 17 ...

Страница 18: ...18 Wireless Encoder in Parking and access control equipment manufactured in the UK Automatic Sliding Gates ...

Страница 19: ...put relay The selected output relay is energized under the following conditions Notes Area 0 If End position Door OPEN was reliably detected 1 If End position Door OPEN was not reliably detected 2 If End position Door CLOSE was reliably detected 3 If End position Door CLOSE was not detected 4 If there is no fault condition or emergency stop controller in Automatic mode 5 Courtyard light function d...

Страница 20: ...ck OPEN forwards OPEN command to second airlock door 17 Test of draw in safety device Relay is active in Endposition Close and is used e g to switch of the photo eye of the draw in safety in order to test it If this Function is used you must use the N O normally open contact of the relay because the relay is switched on if the Test Mode doesen t work 25 Test at the End Position Door Open Relay wor...

Страница 21: ...es 5 6 Sensitivity 4 Steps DIP Switch 7 Holding Time 5 mins Infinity Note Loop will recalibrate after 5 minutes constant detection DIP Switch 8 Frequency High Low 5 7 8 5 7 8 6 6 5 5 6 6 ON MIN ON ON MAX ON 5mins HIGH INFINITE LOW TYPICAL EXAMPLE OF LOOP INSTALLATION INSTALLING A LOOP Rubberised insulated wire of 0 75 1 50 sq mm awg 20 awg 16 preferably multi stranded Note High bed vehicles require...

Страница 22: ...22 in Parking and access control equipment manufactured in the UK Automatic Sliding Gates Loop Detector Settings ...

Страница 23: ...o cells make sure they are debris free Mains on but no power Isolator fuse Check and meter fuse in isolator gate not going up Access control may be faulty Remove and check gate function via the Panel buttons gate Staying up Car has driven off before clearing the loop panel is configured without no passage timer Complete cycle by going through the ground loop e 211 displaying on screen gate door is o...

Страница 24: ... shaft connections Gate not moving or moving half way Gearbox or gate track damaged Gears Track stripped due to overlading replace Gate crashes into catch post Cantilever arm not adjusted correctly Adjust and check alignment Gate not running at all Door has been left open or switch not making Close the door and check display is not reading e 211 Gate open and will not close Key switch is left in o...

Страница 25: ...fety on this site Signed Potential System Hazard Areas in Parking and access control equipment manufactured in the UK Automatic Sliding Gates 25 Please note these are things that you should look out for with the equipment that has been installed on your your customers site This is in no way a health and safety guide just a few key areas for you to be aware of and possibly make future changes to ...

Страница 26: ...ormation Use a separate sheet if necessary If more than one Gate how are they operating Master Slave Independant Section 5 a Delivery or Install Address install equipment supply only UPS Battery back up used for panel protection and gate can open close automatically after power loss HIGHLY RECOMMENDED Todays Date Required Delivery Date Height of Gate required Spikes Required yes or no Type of Infil...

Страница 27: ... time out etc System has had the completed conformity certificate All items on the delivery note have been handed over to client site this should be signed for on the separate sheet which is titled Delivery Note green or yellow paper if parts missing call supplier The engineer has expressed the importance of regularly maintaining the equipment POWER ISOLATION The power isolator for your automation ...

Страница 28: ...20 20 20 This Manual must be completed in accordance with the guidelines below at any point service repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or recent modifications and or problems to help an engineer in the event of any future work required on th...

Страница 29: ...P9000A M 5 0 System guides and drawings as defined within O M Manuals Part 4 The following test procedures refer Check Lists pages 15 16 Commissioning Certificate Part 5 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Signing Position Parts Handed Over Qty Part 6 Certificate Signing off Section Client Name On Behalf of Addre...

Страница 30: ...s BS EN 292 Parts 1 2 1991 BS EN 60204 Part 1 1993 BS EN 294 1992 BS EN 249 1993 BS EN 418 1992 and BSEN13241 1 including other standards BS EN 12445 2008 BS EN 12453 2008 We hereby certify that the machinery stipulated below complies with all relevant provisions of the EC Machinery Directive and National Laws and Regulations adopting this Directive Responsible Person Name Anthony Green Signature ...

Страница 31: ...in Parking and access control equipment manufactured in the UK Automatic Sliding Gates Electronics Certificate 31 ...

Страница 32: ...VIRONMENT NOXIOUS MATERIALS EUROPEAN MARK CERTIFYING CONFORMITY TO THE ESSENTIAL REQUIREMENTS OF THE STANDARDS 2006 42 EC Proudly Proudly Made Made in the UK in the UK Proudly Made Made using recycled paper The manufacturer reserves the right to make amendments to this manual without prior notice and declines all responsibility for any errors personal injury or damage to property ...

Отзывы: