MAN-M-O-220_01
24/01/2019
Page
46
of
72
The maintenance location defines the recommended position of the RRV for
completion of maintenance actions. Subject to component access, maintenance
actions can be completed in the five following locations: -
16.1.1.
On Site
Here all maintenance action of examination and repair / replacement of the
component(s) can be completed with the unit on site.
16.1.2.
Examination on Site, Replacement in Workshop
Here the visual examination of the component can be completed with the vehicle on
site, but it is recommended that the maintenance actions take place in workshop
conditions.
16.1.3.
Workshop
Here the component is not readily visible / accessible when fitted to the vehicle. It is
recommended that the maintenance and examination of these components is
carried out in a suitable workshop.
16.1.4.
Examine at time of Overhaul
Here the component is assessed not to require general maintenance (i.e. sealed
bearings) and the item is planned for repair or replacement within the overhaul
schedule.
16.1.5.
On Equipment, replaced through LRU
Here the component cannot be inspected on vehicle and can only be assessed
using specialist equipment. The component is therefore assessed as a line
replaceable unit (LRU) which will be offered on an exchange basis only.
Note:
All maintenance tasks recommended for completion on site can also be performed
with the equipment located within a workshop. The maintenance schedules
contained within this document should be copied prior to completion and the
completed sheet stored at the rear of the Product folder. Do not record information
directly onto this document.
For spare parts please contact your nearest Permaquip service centre. It is
recommended that parts are purchased from Permaquip to ensure machine
reliability and safety.
Upon completion of any maintenance, a Safety Exam must be performed. Follow the
Shift & Safety Maintenance Programme to do this.
Содержание Kubota RTV X900 RRV
Страница 14: ...MAN M O 220_01 24 01 2019 Page 14 of 72...
Страница 19: ...MAN M O 220_01 24 01 2019 Page 19 of 72 5 2 Dimensions...
Страница 38: ...MAN M O 220_01 24 01 2019 Page 38 of 72 9 5 Hydraulic Rail Gear Schematic...
Страница 65: ...MAN M O 220_01 24 01 2019 Page 65 of 72 20 FASTENER TORQUES...
Страница 66: ...MAN M O 220_01 24 01 2019 Page 66 of 72...
Страница 67: ...MAN M O 220_01 24 01 2019 Page 67 of 72...
Страница 68: ...MAN M O 220_01 24 01 2019 Page 68 of 72...
Страница 70: ...MAN M O 220_01 24 01 2019 Page 70 of 72...
Страница 71: ...MAN M O 220_01 24 01 2019 Page 71 of 72...
Страница 72: ...MAN M O 220_01 24 01 2019 Page 72 of 72...