Spectrometer Installation
2
-18
0993-5255
Filling the cooling system
The cooling system is self-priming; air in the system is removed automatically as
the cooling system operates. The coolant is a 1:10 solution of glycerol in water
(1 part glycerol plus 9 parts water).
Note:
The cooling system contains 0.5 L glycerol when it leaves the factory.
(See ‘Cooling system maintenance procedures’ in the Graphite Furnace User’s
Guide for the procedure to follow when you empty and refill the cooling system.
Do not use antifreeze.)
.
1. Remove the stopper from the top of the
cooling system – twist and pull.
2. Fill the system to the
Max
mark with
sediment-free drinking water – about
4.5 L.
Do not use deionized water since this can
cause corrosion.
3. Replace the stopper securely.
Water level indicator
Max
Min
Содержание AAnalyst 700
Страница 1: ...ATOMIC SPECTROMETRY User s Guide AAnalyst 700 Atomic Absorption Spectrometer Return to Document Menu...
Страница 2: ......
Страница 3: ...ATOMIC SPECTROMETRY AAnalyst 700 Atomic Absorption Spectrometer User s Guide...
Страница 8: ...Contents C 4 0993 5255...
Страница 10: ...1 2 0993 5255...
Страница 44: ...Safety Regulatory Information 1 36 0993 5255...
Страница 46: ...Spectrometer Installation 2 2 0993 5255...
Страница 68: ...Spectrometer Installation 2 24 0993 5255...
Страница 70: ...Preparing the System 3 2 0993 5255...
Страница 84: ...System Maintenance 4 2 0993 5255...
Страница 98: ...Parts and Supplies 5 2 0993 5255...
Страница 102: ...Laboratory Requirements 6 2 0993 5255...
Страница 120: ...Spectrometer System Description 7 2 0993 5255...
Страница 136: ...Translations of Warnings 8 2 0993 5255...
Страница 146: ...Translations of Warnings 8 12 0993 5255...
Страница 185: ...0993 5255 In 1 Index...
Страница 186: ...Index In 2 0993 5255...
Страница 192: ......
Страница 193: ......