Surface Fixed
1
. Assemble 5 sections of
wooden Base using screws
provided
2
.Attach Surface fixing
brackets to the base using the
coach screws
Installation Instructions
Tubular Bells will arrive on
site in pre assembled
Ground Surface
Ground Fix
Components:
89 Kg
Spares available form
percussionplay.co.uk
or from your
local distributor
Pair Large Red
Beaters X1
Instrument
Components:
Tubular Bells
are pre-
assembled
Weight of heaviest part
31kg
(Wooden Base)
Tubular Bells
Page 1 of 2
BS EN 1176
3
.
Locate Base
in desired
location and mark holes to fix
to desired surface
.
4
.
Fix to Surface using
recommended ground
anchors not supplied
5
. Make sure all fixings are
covered and secure using
cover caps provided
6
. Insert Tubular Bells into
base an fix in place using
screws provided.
M8x50 Coach Screw
x6
L Brackets
x6
2 Part Cover Cap
x6
5x70 Screw
x9
6x120 Screw
x10