
Instructions and user manual DOS-ECO
NOT041ENV01_FP1
6
In case of damage of power supply cord please ask the repair to our technical assistance or qualified and authorized
personnel, to avoid any hazard.
When you decide to make no further of an installed pump, make sure to disconnect it from the power supply.
Before carrying out any service on the item, check:
1) Disconnect the plug from the mains.
2) Relieve all the pressure from the pump head or the injection tube.
3) Drain or flush all dosing liquid from the pump head. This operation can also be done with the pump disconnected
from the plant by turning the pump upside-down for 10 seconds and without connecting the tubing to the nipples.
In event of possible losses on the hydraulic system of the pump (breakage of the O-ring, the valves or the hoses),
the pump should immediately be brought to a stop, emptying and depressurizing the delivery hos while taking all
due the safety precautions (gloves, goggles, overalls, etc.).
1.5
Toxic and/or dangerous liquid dosage
To avoid risk from contact with hazardous liquids or toxic fumes, always adhere to the notes in this instruction
manual:
• Follow the instructions of the dosing liquid manufacturer
• Check the hydraulic part of the pump and use it only if it is in perfect condition
• Use only the correct materials fir the tubing, valves and seals to suit the liquid to be dosed : where possible shield
the tubing with PVC conduit.
• Before disconnecting the metering pump, make sure to flush out and neutralize the pump head with the proper
reagent liquid.
1.6
Assembling and dismantling the pump
1.6.1 Assembly
3 RECOMMeNDATIONS and INSTALLATION
page 9
1.6.2 Dismantlement
Proceed as follows when you dismantle the pump or before performing any operation on it :
•
Disconnect the plug from the mains.
•
page 5
Содержание iQntrol DOS-ECO
Страница 1: ...www peraqua com DOS ECO INSTRUCTIONS AND USER MANUAL...
Страница 13: ...Instructions and user manual DOS ECO NOT041ENV01_FP1 13 Positioning on a vertical pipe...
Страница 21: ...Instructions and user manual DOS ECO NOT041ENV01_FP1 21 STEP 12 Installation of the probe pH J1 and Rx J2 2 3 1...
Страница 32: ...Instructions and user manual DOS ECO NOT041ENV01_FP1 32 6 3 Installation of a long probe 120 mm J G P 1 2 3...