
19
9165
201
3-
06
18
OIT***-F113-B12-CB*
Installation
5
Installation
5.1
Preparation
Unpacking the unit
1. Check that all package contents are present and undamaged.
If anything is damaged, inform the shipper and contact the supplier.
2. Check that all items are present and correct based on your order and the
shipping documents.
If you have any questions, please contact Fuchs.
3. Keep the original packing material in case you need to store or ship the unit at
a later time.
5.2
Mounting the Device
The device has a preassembled mounting base with four M6 threads positioned
symmetrically on the base of the housing to allow easy installation of the OIT
system in your plant.
The following illustration shows all the relevant housing dimensions in mm:
Figure 5.1
Dimensions of the OIT300 and OIT500 system
4xM6
10
57
156
57
256
10
6
8
20