Installer manual Fleck 5800 XTR - Installation
44 / 126
Ref. MKT-IM-006 / E - 12.11.2019
5.7
Regeneration flows
Softener Metered Immediate:
Measures water usage and regenerates the system as soon as the calculated system capacity is
depleted. The control calculates the system capacity by dividing the unit capacity by the feed water
hardness. Softener Immediate systems do not use a reserve volume. The controller will also start
a regeneration cycle at the programmed regeneration time if a number of days equal to the day
override pass before water usage depletes the calculated system capacity. The day override
parameter default is
OFF
, and
REGEN TIME
will be greyed out unless the day override value has
been modified.
Caution - material
Constant regeneration due to bad programming !
When setting the system for softener immediate regeneration, setting the capacity to a
value lower than that of feed water hardness may cause the system to constantly
regenerate. If this occurs, disconnect the motor from the controller and correct the
capacity and feed water hardness values in master settings. See Settings screen [
60] for more information.
Softener Metered delayed:
Measures water usage and regenerates the system at the selected regeneration time after the
calculated system capacity is depleted. The control calculates the system capacity by dividing the
unit capacity by the feed water hardness and subtracting the reserve.
The reserve should be set to ensure that the system delivers treated water between the time the
system capacity is depleted and the actual regeneration time. Reserves can be set at a fixed
volume, fixed percentage of capacity, a variable reserve based on the previous calendar day's
water usage, or a weekly reserve based on the average water usage for the current day of the
week. The default setting for the day override parameter is
OFF
, and the default reserve type is
weekly reserve.
A softener delayed controller will also start a regeneration cycle at the selected regeneration time
if a number of days equal to the day override pass before water usage depletes the calculated
system capacity.
If the regeneration type is changed from softener immediate to softener delayed (or vice-versa),
all parameters within those types will be reset to factory default.
Time clock:
Triggers a regeneration on a timed interval. The controller will initiate a regeneration cycle at the
selected regeneration time when the number of days since the last regeneration equals the day
override value. The day override can be set from 1 - 99 days as well as partial day intervals of 4, 8,
12, 16 and 20 hours.
Содержание Fleck 5800 XTR
Страница 1: ...FLECK 5800 XTR INSTALLER MANUAL WATER PURIFICATION...
Страница 17: ...Installer manual Fleck 5800 XTR Description Ref MKT IM 006 E 12 11 2019 17 126 3 3 Outline drawing...
Страница 103: ...Installer manual Fleck 5800 XTR Maintenance Ref MKT IM 006 E 12 11 2019 103 126...
Страница 126: ...www pentairaquaeurope com...