Installer manual Fleck 3150 NXT/NXT2 - Maintenance
Ref. MKT-IM-010 / C - 18.10.2019
151 / 182
9.4.11
Valve on tank assembly
a) Lubricate the Oring with approved silicone grease.
b) Spin the valve (
1
) onto the tank (
2
), ensuring the threads are not cross-threaded.
c) Rotate the valve (
1
) clockwise and freely, without using force until it comes to a
stop.
Info
This stop position is considered point zero.
d) Rotate the valve (
1
) clockwise from point zero to between ¼ turn and ½ turn.
CAUTION
Do NOT exceed 27 Nm of torque when installing the valve. Exceeding this limit may
damage the threads and cause failure.
Point 0
½ turn
Point 0
¼ turn
Содержание FLECK 3150 NXT
Страница 1: ...FLECK 3150 NXT NXT2 INSTALLER MANUAL WATER PURIFICATION ...
Страница 137: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 137 182 AC motor DC motor ...
Страница 139: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 139 182 DC motor ...
Страница 141: ...Installer manual Fleck 3150 NXT NXT2 Maintenance Ref MKT IM 010 C 18 10 2019 141 182 AC motor DC motor ...
Страница 144: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 144 182 Ref MKT IM 010 C 18 10 2019 ...
Страница 148: ...Installer manual Fleck 3150 NXT NXT2 Maintenance 148 182 Ref MKT IM 010 C 18 10 2019 ...
Страница 182: ...www pentairaquaeurope com ...