
P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
PES1900NR Operations Manual
Chapter 5. Installing the Growth Cabinet — 57
Step 2 – Mount the Growth Cabinet
1. Mount the second channel growth cabinet in either of two ways:
•
Horizontally
•
Vertically
2. Install the Growth Cabinet back plate.
3. Install the RF cables.
4. Install the Alarm Cable
Figure 23 Horizontal Mount