— Chapter 8. Powering the PES1900GI NR
PES1900NR Operations Manual
126
Figure 110 Front Panel of the BUPS-25/80 Rectifier/Charger
7. Verify the voltage, using the BUPS Test Terminals.
The multi-meter should read approximately 27 Volts.
8. Close the Repeater Power Switch.
9. Observe the Repeater load (Amps), using the BUPS Load Test Terminals. Under normal
conditions, the load should be approximately 6.0 Amps for a Primary Channel, and
10.2 Amps with a two-channel system (Primary and Growth Cabinets).