Step 8.
Remove the blank cover from the selected slot in the frame and mount the system by sliding
its mounting blades into the frame. Repeat this step to install an additional system in the other side
of the frame, if needed.
Step 9.
Tighten the capture nuts to secure the system in the frame. The recommended torque on the
right screw is 3.0-3.36 Nm while on the left screw recommended torque is 0.89-0.98 Nm.
Figure 37: Sliding the System’s Blades in the Rails
Cable Installation
All cables can be inserted or removed with the unit powered on.
To insert a cable, press the connector into the port receptacle until the connector is firmly seated.
The LED indicator, that corresponds to each data port will light when the physical connection is
established. When a logical connection is made, the relevant port LED will turn on.
To remove a cable, disengage the locks and slowly pull the connector away from the port receptacle.
The LED indicator for that port will turn off when the cable is unseated.
For more information about port LEDs, refer to
Port LEDs
.