
AIR10-1420A Operation Manual
Installation of Robot Body
9
(a)
(b)
Fig. 4-2 Schematic Diagram
Bracket Fixing
Bracket fixing process (mode 2) is as follows:
1. Install the manipulator base on the bracket with eight M20x40 bolts
(Grade 12.9).
Mounting surface of bracket shall meet certain flatness requirements as
shown in Fig. 4-3.
Warning
Fixing screw M20 of manipulator shall not be shorter than 40 mm, and the
insufficient length will cause the poor fixing and other accidents.
When installing the manipulator ceiling, the length of fixing screws for
manipulator shall be increased to 45 mm and the thickness of mounting plate
shall be not less than 30 mm.
Manipulator base
M20X40 Screw
Fixing plate of robot
M20 chemical bolt
Concrete
0.3
6.3