background image

96 Continuity Clip

96 Continuity Clip

General Information

96 Continuity Clip

Code Description Vb Vh Vl

Pegler Yorkshire reserve the right to change specifications

Dimensions

Pegler Yorkshire Customcare 10 Year Guarantee - Terms and Conditions

 

Products are subject to a 10 year guarantee that is between Pegler Yorkshire and the final purchaser of the
product. 

The guarantee is subject to proof of purchase being supplied. 

This guarantee does not affect any statutory rights the consumer may have in law. 

The guarantee covers manufacturing or material defects and does not cover parts subject to normal wear
and tear. 

This product range has been designed for the use of homeowners, domestic and commercial applications
and therefore the guarantee is subject to the product being properly selected for their intended service
conditions. 

The guarantee is not applicable where the product is fitted contrary to the conditions in the fitting
instructions. 

Abusive behaviour and accidental damage to the product are not covered by this guarantee. 

The extent of this liability is limited to the cost of the replacement of the defective item and not to fitting or
consequential damages.

Guarantee

Pegler Yorkshire Group Ltd, St Catherine's Ave, Doncaster, S Yorkshire, DN4 8DF 
Telephone: Phone +44 (0) 844 243 4400 Fax: +44 (0) 844 243 9870 Website: www.pegleryorkshire.co.uk
Registered office : Pegler Yorkshire Group Ltd, St Catherine's Ave, Doncaster, S Yorkshire, DN4 8DF Company no : 00401507

Содержание OKA 4S4031

Страница 1: ...has been designed for the use of homeowners domestic and commercial applications and therefore the guarantee is subject to the product being properly selected for their intended service conditions Th...

Страница 2: ...Guide to the installation care and maintenance of OKA CP Thermostatic Bar Shower 4S4031 Pegler Limited St Catherine s Avenue Doncaster South Yorkshire DN4 8DF Telephone 01302 560560 Fax 01302 560109 4...

Страница 3: ...erating pressure on hot and cold line should be kept as balanced as possible in order to assure maximum efficiency When the supply is higher than 5 Bar a Pressure Reducing Valve should be fitted befor...

Страница 4: ...SERVICING Flush out supply pipes before fitting the shower valve as debris will prevent the shower valve working to its optimum level To prevent debris damaging the shower valve we recommend that you...

Страница 5: ...chnical customcare line 0870 1200285 www pegler co uk HEAD OFFICE Pegler Limited St Catherine s Avenue Doncaster South Yorkshire DN4 8DF Tel 01302 560560 Fax 01302 367661 Internet www pegler co uk EXP...

Страница 6: ...falls below 7 C the valve will automatically open giving protection against freezing Provided that the boiler remains in operation via a frost stat 7 Removal of Radiator The 0 Setting on the TRV is a...

Страница 7: ...ng a lock shield valve this must be set to control the water flow through the radiator to the correct level PLEASE NOTE To avoid the problem of hydronic water flow noise it is recommended that the dif...

Отзывы: