65
MAINTENANCE
11. MAINTENANCE
WARNING
Product Safety Information
Refractory Ceramic Fiber Product
This appliance contains materials made from refractory ceramic fibers (RCF). Airborne RCF
fibers, when inhaled, have been classified by the International Agency for Research on
Cancer (IARC), as a possible carcinogen to humans. After the RCF materials have been
exposed to temperatures above 1800°F, they can change into crystalline silica, which has
been classified by the IARC as carcinogenic to humans. If particles become airborne during
service or repair, inhalation of these particles may be hazardous to your health.
Avoid Breathing Fiber Particulates and Dust
Suppliers of RCF recommend the following precautions be taken when handling these
materials:
Precautionary Measures:
Provide adequate ventilation.
Wear a NIOSH/MSHA approved respirator.
Wear long sleeved, loose fitting clothing and gloves to prevent skin contact.
Wear eye goggles.
Minimize airborne dust prior to handling and removal by water misting the material and
avoiding unnecessary disturbance of materials.
Wash work clothes separately from others. Rinse washer thoroughly after use.
Discard RCF materials by sealing in an airtight plastic bag.
First Aid Procedures:
Inhalation: If breathing difficulty or irritation occurs, move to a location with fresh clean air.
Seek immediate medical attention if symptoms persist.
Skin Contact: Wash affected area gently with a mild soap and warm water. Seek immediate
medical attention if irritation persists.
Eye Contact: Flush eyes with water for 15 minutes while holding eyelids apart. Do not rub
eyes. Seek immediate medical attention if irritation persists.
Ingestion: Drink 1 to 2 glasses of water. Do not induce vomiting. Seek immediate medical
attention.
Содержание PureFire PF-110
Страница 26: ...24 WATER PIPING AND CONTROLS Figure 4 7 Two Boilers Primary Secondary with Four Zones Zone Circulator ...
Страница 27: ...25 Figure 4 8 Three Boilers Primary Secondary with Five Zones Zone Circulator WATER PIPING AND CONTROLS ...
Страница 28: ...26 WATER PIPING AND CONTROLS Figure 4 9 Three Boilers Primary Secondary with Four Zones Zone Valves ...
Страница 37: ...35 ELECTRICAL CONNECTIONS Figure 7 5 Internal Wiring Schematic for PF 50 PF 80 PF 110 PF 140 boilers ...
Страница 38: ...36 Figure 7 6 Internal Wiring Schematic for PF 200 PF 210 PF 300 PF 399 boilers ELECTRICAL CONNECTIONS ...
Страница 75: ...73 REPAIR PARTS Figure 13 2 Heat Exchanger Burner Assembly Repair Parts PF 50 PF 80 PF 110 PF 140 ...
Страница 77: ...75 REPAIR PARTS Figure 13 3 General Repair Parts PF 200 PF 210 PF 300 PF 399 ...
Страница 79: ...77 Figure 13 4 Heat Exchanger Burner Assembly Repair Parts PF 200 PF 210 PF 300 PF 399 REPAIR PARTS ...
Страница 82: ...80 APPENDIX A STATUS SCREENS APPENDIX A STATUS SCREENS ...
Страница 83: ...81 APPENDIX A STATUS SCREENS ...
Страница 84: ...82 APPENDIX A STATUS SCREENS ...
Страница 85: ...83 APPENDIX A STATUS SCREENS ...
Страница 86: ...84 APPENDIX B USER MENU APPENDIX B USER MENU ...
Страница 87: ...85 APPENDIX C INSTALLER MENU APPENDIX C INSTALLER MENU ...
Страница 88: ...86 APPENDIX C INSTALLER MENU ...
Страница 89: ...87 APPENDIX C INSTALLER MENU ...
Страница 90: ...88 APPENDIX C INSTALLER MENU ...
Страница 91: ...89 APPENDIX C INSTALLER MENU ...