ISSUED: 07-08-05 SHEET #: 055-9430-1
Visit the Peerless Web Site at www.peerlessindustries.com
4 of 9
For customer service call 1-800-729-0307 or 708-865-8870.
Drill two 1/4" (6 mm) dia. holes to a minimum depth of
2.5" (64 mm). Attach projector mount assembly (
A
)
using two concrete anchors (
G
), two flat washers (
E
),
and two #14 x 2.5" wood screws (
F
) as shown in
Illustration A
and
1
,
2
, and
3
(below). Tighten wood
screws (
F
) using 3/8" (10 mm) socket wrench until
projector mount assembly (
A
) is firmly attached.
1
3
Drill hole and insert anchor
Place ceiling plate or mount over anchor and secure
with screw
After repeating step one tighten all fasteners
CUT
A
W
A
Y
VIEW
INCORRECT
concrete
metal
bracket
plaster/
dry wall
CORRECT
concrete
metal
bracket
plaster/
dry wall
concrete
ceiling
F
F
F
Illustration A
Installation to Concrete Ceilings
A
2
A
CONCRETE CEILING
E
G
G
G
Note:
It is the responsibility of the installer to
verify that the ceiling will safely support the
combined load of all attached hardware and
components.
Skip to step 6.
G
FRONT OF
MOUNT
• Concrete anchors are
not
intended for attachment to
concrete ceiling covered with a layer of plaster,
drywall, or other finishing material. If mounting to
concrete ceiling covered with plaster/drywall is un-
avoidable, plaster/drywall (up to 5/8" thick) must be
counterbored as shown below. If plaster/drywall is
thicker than 5/8", custom fasteners must be supplied
by installer.
WARNING
• Tighten wood screws firmly, but do not overtighten.
Overtightening can damage the screws, greatly
reducing their holding power.
• Never tighten in excess of 80 in • lb (9 N.M.).
WARNING