Page 19
Connecting to the application
Using the tubing provided, connect the outlet of the unit to the inlet on the application.
If you require more tubing than is supplied please refer to the Tubing Lengths section below.
Once the tubing is connected to the application, please ensure that it is
thoroughly checked for leaks. Even the slightest leak in the gas supply
between the generator and the application can lead to a reduction in
efficiency and gas purity.
Tubing Lengths
The diameter of the tubing which will be connected to the gas outlet is
important and is determined by the length of tubing required. Failure to
follow these recommendations could lead to pressure drops between
generator and application.
< 3 meters: Use 6mm OD / 4mm ID or 1/4” OD / 3/16” ID tubing.
> 3-10 meters: Use 8mm OD / 6mm ID or 5/16” OD / 1/4” ID tubing.
Some tubing and fittings not supplied in the fittings kit.
> 10 - 40 meters: Use 10mm OD / 8mm ID or 3/8” OD / 5/16” ID tubing.
> 40 metres: Please contact Peak Scientific with the relevant distance and we will
calculate the flow resistance and the tubing size required.
CAUTION
CAUTION
Содержание TOC 1000
Страница 25: ...Page 25...