Page 

Page 6 of 7 

 

17.

 

 

18. 

Switch the generator power 

ON

 at the switch 

on the front panel.

 

After several minutes the generator will 

indicate it is ready for use with a solid green 

ready indicator. Ensure all external fittings 

are leak tested.

 

19.

 

 

 

 

CONGRATULATIONS 

 

Your 

PEAK SCIENTIFIC

 gas generator is now fully installed, operational and ready to 

supply gas on demand to your instrument. 

General Notes 

 

The generator will operate on voltages of /- 10%. This means it will operate 

between 207V and 253V. If the generator is operated on a supply voltage of less than 
220V the internal compressor will work harder and the service life of the compressors 
will be reduced. It is ok to operate the generator on a mains voltage between 207V and 
220V for a short period of time, however we would recommend fitting the transformer, 
detailed below, at your earliest convenience. Mains voltages between 220V and 253V 
no transformer is required. 

 

The Transformer can be ordered directly from Peak Scientific, Peak part number is... 

06-3200 

– Dual Tap Transformer 200V – 230V

 

 

For all other technical specifications, operating instructions, 
service requirements, contact details and trouble shooting, 
please refer to the user manual contained on the CD supplied 
in the fittings kit. Please keep this for future reference.

 

 

Содержание FUSION 1010

Страница 1: ...2 8100 Part No IG FUSION 1010 Inchinnan Business Park F 44 0 141 812 8200 Rev 3 Inchinnan PA4 9RE W www peakscientific com Scotland UK E info peakscientific com Page Page 1 of 7 Installation Guide FUS...

Страница 2: ...ovided in the fittings kit turn the lock 90o to the left An earth lead is connected to the inside of the panel This can be removed by pulling it off the spade connector on the door 4 5 With the RH sid...

Страница 3: ...6 7 Re connect the earth connection by pushing the spade connector onto the spade terminal as shown Place the door panel in position 8 The locks are secured by turning the lock 90o to the right using...

Страница 4: ...r 5 8 spanner Connect the 2m Nylon tube to the drain line ensure the tube is pushed fully in and gripped securely by the fitting Fit the other end of the drain line to a suitable drain connection or c...

Страница 5: ...completion is indicated by a solidly illuminated green ready LED This will take up to 3 hours NOTE The generator must be allowed to complete its start up procedure as per step 14 This time should be...

Страница 6: ...0 This means it will operate between 207V and 253V If the generator is operated on a supply voltage of less than 220V the internal compressor will work harder and the service life of the compressors w...

Страница 7: ...m is not returned to Peak Scientific then the Generator Warranty is for the lesser period of twelve months from the date of delivery or thirteen months from the date of dispatch from the factory To re...

Отзывы: