PB International 10042 Скачать руководство пользователя страница 1

1 of 29 

 
 
 

 

Installation and operating instructions 

UFKS and AquaproteQ 

Ultrafiltration gatekeeper system 

 

  

 

 

Suitable for UFKS and AquaproteQ with touchscreen

 

 

IMPORTANT 

READ CAREFULLY BEFORE USE 

KEEP FOR FUTURE REFERENCE 

ENGLISH 

 
PB International BV 
Stikkenweg 50 
7021 BN, Zelhem 
The Netherlands 

Содержание 10042

Страница 1: ...ions UFKS and AquaproteQ Ultrafiltration gatekeeper system Suitable for UFKS and AquaproteQ with touchscreen IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE ENGLISH PB International BV S...

Страница 2: ...tration Device Delos UFKS Ultrafiltration system with peripheral equipment User Person who uses water from the downstream installation or otherwise comes into contact with the device with the exceptio...

Страница 3: ...ware of section 4 Make the user aware of section 7 Fill in the details in section 8 5 1 8 Disclaimer To ensure proper operation of the equipment the instructions given in these installation and operat...

Страница 4: ...ger guaranteed to be safe This can lead to health risks Have the filter thoroughly cleaned regularly Please contact your supplier for this This is the only way to ensure the operation of the equipment...

Страница 5: ...ed for installation work Reinstall all parts after installation work Inspection serial number or other indication stickers must never be removed or covered and must be legible throughout the lifetime...

Страница 6: ...e must be installed in the supply to the product After installation of the equipment complete cleaning and disinfection of the equipment and the entire downstream equipment is required to create a hyg...

Страница 7: ...is 99 9999 Log 6 Forward flush The Central ultrafiltration system is equipped with an automatic forward flush function At this stage all trapped bacteria that remain in the membranes are flushed to th...

Страница 8: ...iple of the product is ultrafiltration in which the upstream water supply is separated by a physical barrier from the downstream water downstream installation All parts in water smaller than nominal 0...

Страница 9: ...ter connection 4 Information touchscreen panel 5 Supply valve 6 Operating switch 7 Check valve air supply 8 Air hose 9 Main valve filter module 10 Power cord 11 Mounting bracket filter modules 12 Meta...

Страница 10: ...50 60Hz Phase sensitivity Not phase sensitive Protection class Grounded Output voltage 24V DC Nominal power 5W Max power 60W Pore size Nominal 0 02 micron Max temperature 40 C 104 F Material PVC U Max...

Страница 11: ...it This can damage them irreparably Do not use the product if it is damaged Always contact your supplier Never attempt to repair the product yourself The filter is designed for the purpose of removing...

Страница 12: ...his document When mounting on the wall check that the wall and floor can support the weight of the equipment 5 4 Connections When connecting the equipment use FTPE sealing tape or FTPE sealing wire Th...

Страница 13: ...amaged product Clear the wall where the system will be installed Check if the wall can carry the weight of the system Install the system with at least 2 persons Use a spirit level to level the system...

Страница 14: ...he outer packaging Check the packaging and the product for damage Never install a damaged product Clear the wall where the system will be installed Check if the wall can carry the weight of the system...

Страница 15: ...system to the threaded coupling marked with 2 Wrong connection results in a non working system Connecting the drain Connect the flushing pipes individually to the drain outlet with an open connection...

Страница 16: ...the two coil flows remain separate from each other If this does not happen bacteriological contamination of the downstream system can occur The following requirements have been set for the drain b G...

Страница 17: ...s can be done in the following manner Modbus RTU trough RS485 Contact your supplier for the data Malfunction signal trough relay output Contact your supplier for installation 5 7 Connecting additional...

Страница 18: ...y pressure which should be at least 2 bar 29 psi and a maximum of 6 bar 87 psi Check the wiring of the equipment 6 2 Commissioning procedure Open the main shut off valve of the drinking water installa...

Страница 19: ...control of the equipment is set to average water quality With these settings in principle every device will continue to function properly at every location Rinsing time forward flush 10 seconds Rinsin...

Страница 20: ...nge display settings Alarmhistory Settings Set date and time Set times for integrittest en flushing SET TIMES Set date and time Set times for integrity test and flushing Turn on and off the flush and...

Страница 21: ...ter pressure on tapping points Capacity reduction due to pollution Membrane breakage on a part of the filter modules The permeate pressure is too low Have the equipment cleaned to remove all micro con...

Страница 22: ...cted Contact your supplier for support ERROR 201 Water pressure too low Check if there is a water delivery problem in the neighbourhood Check the device and your home installation for leakages The cap...

Страница 23: ...r s permission Never open the by pass without consulting the manufacturer or a party authorized in writing Opening the by pass interrupts the physical barrier The system immediately shuts down the fau...

Страница 24: ...etent diligent manner in accordance with any mutually agreed specifications Seller s warranty does not cover the results of improper handling storage installation commissioning operation or maintenanc...

Страница 25: ...ent provided that a prior written notification is sent to the Seller and the assignment agreement contains terms and conditions which provide the Seller with the protections of the warranties and limi...

Страница 26: ...3 piece connector PVC 2 pcs 31021 UFKM 160 750 UF module 1 pcs per filter 10248 UFKM 160 1000 UF module 1 pcs per filter 10249 for 10046 10048 and 10049 for 10045 10047 and 10050 8 4 Disposal after u...

Страница 27: ...27 of 29 8 6 Maintenance table Date Observation Maintenance work Action Date Initials...

Отзывы: