background image

Ins-30096 Net2Air site surveyor kit

14/11/2012

Technical Support

Technical help is available:     Monday - Friday from 07:00 - 19:00 (GMT)

                                 Saturday from 09:00 - 13:00 (GMT)

01273 811011

[email protected]

Documentation on all Paxton products can be found on our website - http://www.paxton.co.uk/

1. Plug the green surveyor bridge into its power supply or a convenient USB computer port  

    with the cable provided. The Green power LED will illuminate. The Status LED's will flash to 

    confirm that a signal is being transmitted.

2. Place the surveyor bridge at the location where you intend to install an Ethernet/USB bridge.

3. Take the test card to the location where you will be installing the wireless Paxton control unit.

4. Press and hold the button on the test card for at least 15 seconds to ensure a good sample  

    of the signal strength.

5. Providing all LED's light up, it is a suitable location to install the equipment. If not, a new  

    location should be found and checked until all the LED's are lit.

    Note: If the layout or properties of a site change at any point from the point of surveying 

    and installing the equipment, a further test should be carried out.

    See also:  

AN1096 - How to plan a Net2 wireless installation <

 

http://paxton.info/975

 >

To replace the battery, remove the screw, insert a flat blade tool into the slotted end (see label 

on card) and twist.  The two halves of the case will separate.  Replace the battery, clip the two 

halves together again and secure with the screw.

Test Card - Replacing the Battery  (CR2430)

The declaration of conformity is available on request. 

Contact details are provided at:   

http://paxton.info/596

Status LED 

USB power connection 

(Power supply provided) 

Paxton
Access

Power 

Paxton

How to survey a site 

Отзывы: