63
15 Checklist After Installation
Choosing an Installation Location
(See page 11 - 13)
Yes No
Make sure that the Water Heater is not installed in the following places.
• Places where gasoline, benzene and adhesives are handled
• Places in which corrosive gases (ammonia, chlorine, sulfur, ethylene compounds, acids) are
present in the air
• Places dust or debris will accumulate
Installation Clearances
(See page 13 - 14)
Yes No
Make sure that the Water Heater meets the required clearances.
Installation of the Water Heater
(See page 15 - 16)
Yes No
Make sure that the condensate container is filled with water.
Venting the Water Heater
(See page 17 - 36)
Yes No
Make sure that required combustion air is supplied to the Water Heater.
Make sure using vent materials approved for use with category IV appliances.
Make sure that there is no leakage or loose connection in the venting system.
Make sure that the vent length is within the requirement.
Make sure that bird screen(s) is installed on the vent termination.
Make sure that the termination meets the clearance requirements.
When using a horizontal section, make sure that the horizontal vent slope is 1/4 in. upwards for
every 12 in. (300 mm) toward the termination.
Make sure that the intake pipe and exhaust pipe are properly installed.
Make sure that the vent system comforms with local codes, state codes, or national codes as
ANSI/NFPA and CSA.
Connecting the Gas Supply
(See page 37 - 40)
Yes No
Make sure that the gas type is compatible with the type indicated on the Water Heater’s rating plate.
Clean out any debris from the gas piping before connecting the Water Heater.
Make sure that the gas piping size is appropriate.
Make sure that the inlet gas pressure is within the specified range.
Make sure that there are no leaks from the Water Heater and its gas connection.
Connecting the Water Supply
(See page 41 - 46)
Yes No
Clean out metal powder, sand and dirt from the water piping before connecting the Water Heater.
Make sure to check and test the water quality to see if water treatment is necessary.
Make sure that the water supply pressure is 15 to 150 psi (103.4 to 1034 kPa).
Make sure that there is no water leakage from the cold water supply pipe and the hot water
supply pipe.
Make sure that the pressure relief valve is installed.
After installing the Water Heater, review the following checklist. You should be able to answer “Yes” to all of
the items in the checklist. If you answer NO to any item, installation is not complete. Review the appropriate
sections to complete the installation.
If you have additional questions or need assistance with installation, contact Pavilion Customer Center at 1-855-
443-8468
Checklist After Installation
Содержание GQ-C3260WXQ-FF PB US
Страница 72: ......