background image

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

INSTALLATION

OWNER’S

MANUAL

&

GGIG-99

®

Содержание TBIG-03

Страница 1: ...ER S MANUAL INSTALLATION OWNER S MANUAL INSTALLATION OWNER S MANUAL INSTALLATION OWNER S MANUAL INSTALLATION OWNER S MANUAL INSTALLATION OWNER S MANUAL INSTALLATION OWNER S MANUAL INSTALLATION OWNER S...

Страница 2: ...5 1 2 Starting System 13 5 2 Lighting and Shut Down Procedures 13 5 2 1 Lighting Procedures 13 5 2 2 Normal Shut Down Procedures 14 5 2 3 Emergency Shut Down 14 5 3 Switchover to Propane Operation 14...

Страница 3: ...gas fired boiler allows the boiler to be fired by propane in the event that the supply of natural gas is temporarily interrupted or restricted The necessary fittings valves piping and controls for twi...

Страница 4: ...r must be Installed by qualified personnel in accordance with designs prepared by qualified facility engi neers including structural mechanical electrical and other applicable disciplines Operated and...

Страница 5: ...ime Con tact Patterson Kelley at 570 421 7500 for replace ment labels 3 5 SAFETY PRECAUTIONS Provide a suitable location for the boiler away from normal personnel traffic with adequate working space a...

Страница 6: ...Check entire gas train for leaks after installation If there is a smell of gas shut down the boiler and obtain immediate assistance from trained service personnel and or your local fire department Ov...

Страница 7: ...t valves n o vent valve I R I only Figure 4 1 Piping Schematic for the Twin Fuel Gas Train 4 0 INSTALLATION Gas Train Connection Sizes Natural Gas Propane 700 1000 1200 Series 1 1 4 1 1500 1700 2000 S...

Страница 8: ...n either the natural gas or propane supply a suitable intermediate gas pressure regulator of the lock up type must be provided to reduce the pressure to less than 14 inches W C All boilers are designe...

Страница 9: ...d devices as shown above 4 3 PRE START CHECK LIST Before firing the boiler make sure the following items have been completed 1 Flue gas from the boiler is properly vented 2 Gas connections have been m...

Страница 10: ...block on the control panel Disconnect ing this wire disables the main gas valve ensuring that gas cannot flow during the test 2 Turn on the circulating water pump With the natural gas shutoff and sec...

Страница 11: ...rating turn down the temperature setting on the high limit thermostat until the main burner shuts off The high limit switch must be reset manually after testing This check should also be made for the...

Страница 12: ...be performed by qualified service per sonnel To adjust gas pressure first connect an appropriate pressure sensing device at the manifold tap then re move seal cap from regulator Turn adjusting screw c...

Страница 13: ...is OK If there are bubbles replace the valve 5 Attach the hose to the upstream leak test valve 6 Open the upstream leak test valve and check for bubbles in the hose If there are no bubbles the natural...

Страница 14: ...anical link to air control auxiliary panel service power shutoff switch inside auxiliary panel service power shutoff switch inside propane low pressure switch pressure tap secondary shutoff high gas p...

Страница 15: ...been under water Immediately call a qualified service technician to in spect the boiler and to replace any part of the control system and any gas control which has been under wa ter 5 2 LIGHTING AND...

Страница 16: ...the gas supplies remote from the boiler 5 3 SWITCHOVER TO PROPANE OPERATION Switchover from natural gas to propane is made manually as follows 1 Turn the fuel selector switch located on the main contr...

Страница 17: ...y Figure 7 1 Piping Schematic for the Twin Fuel Gas Train 7 0 MAINTENANCE 7 1 GENERAL Warning High voltage Shock hazard Properly lock out tagout the electrical service and all other energy sources bef...

Страница 18: ...or marked Heat 6 The programmer first energizes Terminal 4 which supplies power to the contactor for the blower mo tor and the air flow switch which initially shows low air flow with the LowAir indica...

Страница 19: ...operating control switch will close again The operating sequence will re cycle to step 5 provided that the limits on water flow gas pressure and high temperature are all met 8 0 PARTS AND TECHNICAL S...

Страница 20: ...Gemini Twin Fuel Gas Fired Boiler 8 1 1 Wiring Diagram Lo Hi Lo 18...

Страница 21: ...Parts and Technical Support 8 1 2 Control Logic Diagram Lo Hi Lo 19...

Страница 22: ...Gemini Twin Fuel Gas Fired Boiler 8 1 3 Wiring Diagram On Off 20...

Страница 23: ...Parts and Technical Support 8 1 4 Control Logic Diagram On Off 21...

Страница 24: ......

Отзывы: