5.3 After Repairs or Maintenance
Following any major repairs or preventative maintenance, follow the steps below before returning the
boiler to service.
and all safety checks in
2. Check the gas pressure, refer to
to ensure proper operation of the boiler.
3. Perform combustion check (Refer to
through
) and adjust air/gas mixture at high
fire & low fire if the O
2
% or CO
2
% are out of range.
NOTE
Installation and service must be performed by a qualified
installer or service agency that has been trained on the
Patterson-Kelley boiler.
PRECAUTIONS ASSOCIATED WITH HANDLING REFRACTORY LINING MATERIAL
•
This Patterson-Kelley product contains a Combustion Area lined with
REFRACTORY
CERAMIC FIBERS (RCFs)
similar to many other devices produced in this industry.
•
RCFs have been identified by the
International Agency for Research on Cancer (IARC)
as possibly being carcinogenic to Humans.
•
AVOID breathing particles or dust from
RCFs
and avoid contact with Skin or Eyes.
•
The
National Institute for Occupational Safety and Health (NIOSH)
recommends the use
of a respirator meeting current standards, to avoid inhalation of dust. Also recommended is
loose fitting, long sleeved clothing, eye protection and gloves whenever handling
RCFs
.
Current
NIOSH
Recommendations are listed on their website at
http://www.cdc.gov/niosh/homepage.html
, which should be viewed before the handling or
removal of Refractory Lining Materials on this or any similar device.
•
Using a SPRAY BOTTLE, saturate with WATER; but not dripping, the combustion chamber
lining to prevent dust from becoming airborne.
•
Place removed
RCFs
into a plastic bag for disposal with normal trash.
•
Wash exposed clothing (if not disposable), TWICE and DRY separately from other laundry.