background image

- 7 -

                                     PATON VDI SERIES ECO  DC MMA 

 
 
 
 
 
 
 
 
 
 
 
 

Pic. 1. Control and indication elements 

 

2. SETTING THE WELDING UNIT INTO OPERATION 

 
 

WARNING!!!

 

Read 

Section  11

,  "Safety  instructions",  before  putting  the 

welding unit into operation.

 

 

 

2.1. PROPER USE 

The  welding  unit  is  designed  for  argon  shielded  tungsten-arc  welding  and  for  manual  consumable-
electrode arc welding.  
Any other use of the welding unit is considered as improper. The manufacturer of the welding unit is 
not responsible for damages caused by any improper use of the unit. 
The use of the welding unit is proper if all the requirements of this Operation Manual are met. 

 

WARNING!!!

 

Do not use the welding unit to unfreeze pipes.

 

2.2. REQUIREMENTS FOR INSTALLATION 

The  welding  unit  is  protected  against  ingress  of  foreign  particles  more  than  5.5  mm  in  size,  and  the 
internal  elements  of  the  unit  are  protected  against  moisture,  so  the  unit  is  allowed  for  outdoor 
operation. 

 

WARNING!!!

 

When operating the welding unit in cold season, after the unit 

was switched off and cooled, condensate may appear inside the unit, so switch 
on the welding unit only 3 – 4 hours after the switching off.

 

 

For this reason, do not switch off the welding unit if it is anticipated that the unit is to be switched on 
not later than 4 hours after switching off. 
Install the welding unit so as not to block or cover the ventilation slots on the front and rear panels of 
the unit. Prevent ingress of metallic particles (for example, when grinding the weld) sucked by the unit 
ventilator. 

 

WARNING!!!

 

After fall from a height, the welding unit might be a source of 

electrical shock. Install the unit on a firm stable surface.

 

Содержание VDI-160E

Страница 1: ...1 PATON VDI SERIES ECO DC MMA Operation Manual Inverter rectifiers PATON VDI 160E VDI 200E VDI 250E 4 Contents...

Страница 2: ...OVERED ELECTRODE ARC WELDING PROCESS MMA 8 3 1 INCREASED CURRENT ARC STARTING HOT START 9 3 2 REDUCED WELDING VOLTAGE FUNCTION ARC FORCE 9 3 3 PROTECTION AGAINST ELECTRODE STICKING ANTI STICK 10 4 MAI...

Страница 3: ...es production are in conformity with the product sample detailed in this report The applicant should hold the whole technical report at disposal of the competent all the right Applied EC Directives 20...

Страница 4: ...r rectifiers PATON VDI 160E VDI 200E VDI 250E optimized for direct current manual arc welding MMA This ECO series of devices designed for demanding users who wants the most compact and functional devi...

Страница 5: ...the printed circuit boards with electronic elements are impregnated with two layers of high quality varnish in order to provide the high reliability of the welding unit during its service life 7 The...

Страница 6: ...status of indicator a constantly lit green machine is ready to work b blinks green when striking there is no mains voltage c constantly lit yellow overheating of the source d does not light up no pow...

Страница 7: ...nit is protected against ingress of foreign particles more than 5 5 mm in size and the internal elements of the unit are protected against moisture so the unit is allowed for outdoor operation WARNING...

Страница 8: ...e welding unit see Subsection 1 1 Technical characteristics Connect the welding unit to an electrical outlet that is made for three wire earthing plugs 3 MANUAL CONSUMABLE ELECTRODE ARC WELDING MODE M...

Страница 9: ...at the increased current arc starting stage is 90 0 33 90 120 A 3 2 REDUCED VOLTAGE WELDING FUNCTION ARC FORCE The advantages ensured by the reduced voltage welding function are the following The enh...

Страница 10: ...ctrical outlet of the power supply system Wait for about 5 minutes until static charges in the unit circuits are removed and then perform the maintenance operations After completion of works with the...

Страница 11: ...rding to State Norm for 5 years The welding unit should be stored in a dry closed room at an ambient temperature not lower than 5 C In the room acid vapors and chemically active substances should not...

Страница 12: ...ble 3 m in length 1 pcs 2 Shoulder carry belt 1 pcs 3 Brand corrugated box PATON 1 pcs 4 Welding cable with an electrode holder 3 m in length 1 pcs 5 Welding cable with an earthing terminal 3 m in len...

Страница 13: ...is sufficient for arc staring Select the welding electrode with consideration for the welding current Random arc extinction during welding The arc voltage is too high for the electrode used Use anoth...

Страница 14: ...non flammable radiation absorbing screens VAPOUR AND GASES MAY BE DANGEROUS The resulting smoke and harmful gases should be removed from the work area by means of specialized equipment do not cover t...

Страница 15: ...ny maintenance work on the unit Removing the outside cover of the device while it is connected to the network and using the device with the lid removed is forbidden NOISE ASSOCIATED WITH WELDING CAN B...

Страница 16: ...PATON VDI SERIES ECO DC MMA 16 12 ELECTRICAL SCHEMATIC DIAGRAM 230 V CURRENT BIS 0331 BVR 0331 BPK 0332...

Страница 17: ...the accumulation of conductive dust inside coal dust metal chips etc In case of attempting to repair its nodes and or replacement of electronic components Once on six months clean internal parts and c...

Страница 18: ...above recommendations may result in the imposition of fines in accordance with applicable regulations If you would like to return the unit for disposal please contact your nearest point of sale or co...

Страница 19: ...e Date of reception of the welding unit for repair _____ __________ 20 ___ year _______________________ signature Faults detected ______________________________________________________________________...

Страница 20: ...__________ Tel Technical support 48 889 226 032 Address of the service center 38500 Poland Sanok Zamenhofa 9 Street Date of reception of the welding unit for repair _____ __________ 20 ___ year ______...

Отзывы: