
Operation
© PAT Rev. 7 03/27/01 // MO
191318_7.DOC
21
5 OPERATION
After having set the LMI to the actual crane configuration, the system is ready for operation. The display
shows the LMI screen (example for value representation).
boom length
radius
max. load
actual load
utilization
bargraph
only for craneswith
boom control system
tip height
operation code number
boom angle
reeving
A2B warning - visible
when approaching A2B
condition
Содержание DS 350/1318 Graphic
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 55: ...Troubleshooting PAT Rev 7 03 27 01 MO 191318_7 DOC 49 ...