
HPVA Series Operator’s Manual
Preparing the Sample
Mar 2011
B-9
Preparing the Sample
1. Remove the sample holder from the analysis port.
2. Remove the isothermal jacket.
3. Allow the sample holder to return to room temperature.
4. Remove any condensation that formed on the exterior of the sample holder.
5. Disassemble the sample holder.
6. Weigh the sample. (Refer to
7. Assemble the sample holder. (Refer to
).
8. Degas the sample to remove any moisture or CO
2
from the sample. (Refer to
Make sure the isothermal jacket is removed from the sample holder
before degassing the sample. The isothermal jacket cannot withstand
the heat during the degas process.
9. When the degas is complete, close the Sample isolation valve on the sample holder.
10. Cool the sample holder to room temperature.
Содержание HPVA Series
Страница 1: ...HPVA Series High Pressure Volumetric Analyzer Operator s Manual V4 0 P02 42801 01 March 2011...
Страница 4: ......
Страница 8: ...Table of Contents HPVA Series Operator s Manual iv Mar 2011...
Страница 20: ...Specifications HPVA Series Operator s Manual 1 12 Mar 2011...
Страница 52: ...Definitions of Fields in the System Windows HPVA Series Operator s Manual 2 32 Mar 2011...
Страница 66: ...Displaying Experiment Data HPVA Series Operator s Manual 3 14 Mar 2011...
Страница 70: ...Setting the Sample Bath Temperature HPVA Series Operator s Manual 4 4 Mar 2011...
Страница 98: ...Ordering Informatioin HPVA Series Operator s Manual 7 2 Mar 2011...
Страница 120: ...Analyzing the Results HPVA Series Operator s Manual B 18 Mar 2011...
Страница 124: ...Index HPVA Series Operator s Manual Index 4 Mar 2011...