Parker PEV Скачать руководство пользователя страница 1

Parker Hannifin Corporation

Sporlan Division - Refrigeration Business Unit

2445 South 25th Avenue
Broadview, IL 60155-3891 USA
Phone: (708) 681-6300
Fax: (708) 681-6306

ISO 9001 CERTIFIED

1

2

3

4

1

1

2

3

4

1

2

3

4

X4

X4

X4

Discard

5

Operation

Prior to installing the P-Series Electronic Valve (PEV) the included safety bulletins 
must be read and understood.

ENGLISH

Refrigerants

Suitable for ammonia, CO

2

, and other 

common refrigerants

Liquid Temperature Range

-60ºC to 120ºC (-76ºF to 248ºF)

Ambient Temperature Range

-40ºC to 50ºC (-40ºF to 122ºF)

Maximum Rated Pressure (MRP)

52 barg (754 psig)

Maximum Operating Pressure 
Differential (MOPD)

Figure 1: 

Components

1 - Port Plate Assembly
2 - Bolts, Port Plate
3 - Valve Body
4 - Gasket, Port Plate (New)

Port

Bolt Size

Nm

Ft Lb

20 mm (

3

4

”) to 25 mm (1”)

M12 x 1.75

61

45

32 mm (1

1

4

”) to 40 mm (1

1

2

”)

M16 x 2

149

110

Figure 5: 

Re-Assembly

1 - Gasket, Port Plate (New)

Installation

All personnel working on valves must be qualified to work on refrigeration 
systems. If there are any questions contact Sporlan Division - Refrigeration 
Business Unit before proceeding with the work.

All valves are packed for a maximum protection. Unpack carefully. Check the carton 
to make sure all items are unpacked, see Figure 1 for the list of items included. 

Do not remove the protective coverings from the inlet and outlet of the valve until 
the valve is ready to be installed. Protect the inside of the valve from dirt and chips 
before and during installation. In the event the valve is left disassembled for any 
length of time, protecting the components is essential. Place the components in a 
plastic bag and store them in an area where they will not be damaged.

The valve should be installed in a location where it is easily accessible for 
adjustment and maintenance. The location should be such that the body cannot be 
easily damaged by material handing equipment. Proper indicating gauges should 
be installed to be easily visible to the operating engineer for system checks and 
adjustment purposes.

The valve should be disassembled before welding to prevent damage to o-rings 
and teflon (PTFE) components. First remove the port plate by unbolting the bolts as 
shown in Figure 2. If the port plate does not come apart easily, rotate the port plate 
45º and use the corners to pry the port plate out. If using a tool, such as a screw 
driver, it is important to be careful not to damage any gasket surfaces.

The current port plate gasket must be removed, as shown in Figure 3, and 
discarded. A replacement gasket is provided with every purchase of a new valve.

The PEV valves must be mounted in the upright horizontal position with the actuator 
on the top.

 The valve must be installed with the arrow pointing in the direction of 

flow for the valve to function properly. 

Installers need to follow a WPS (Welding Procedure Specification) for all welding. 
The procedure and welder doing the weld must be qualified to perform that 
procedure. 

The codes applicable to the welding of socket weld valves require that the pipe 
be inserted into the socket until bottomed against the stop, then backed out 
approximately 

1

16

 of an inch (1.6 mm) before welding. Use of welding rings is 

optional but recommended for butt weld valves. They help alignment, control gap 
for full penetration welding, and reduce welding debris entry.

Figure 6: 

Port Plate Torque Specs

Port

MOPD

20 mm (

3

4

”) to 

25 mm (1”)

52 bard (754 psid)

32 mm (1

1

4

”) to 

40 mm (1

1

2

”)

28 bard (406 psid)

Connection Types

SW, BW ANSI, and BW Metric (DN)

P/N 313906RSD 

B

        Date: 11-20        ECO: 0345229

Parker Electronic Valve (PEV)

Installation Information 

Отзывы: