41
Figure 3.3
–
Human-Machine Interface (HMI)/Controller
4.0
COMMISSIONING
4.1
COMMISSIONING CHECKLIST
1.
Inspect - Make sure all external plumbing connections are made per the P&ID diagram. Make
sure all electrical connections to all external devices are connected properly per the electrical
schematics.
2.
Install micron filters.
3.
Install Fresh Water Flushing Filter.
4.
Install Membranes.
5.
Valve Alignment
6.
Ensure that the installation has been properly performed.
7.
Check the RO Membrane Element as described below.
8.
Check the oil level in the HP pump. Be sure it is at the proper level.
Содержание AQUA DUO - A455C
Страница 15: ...15 Figure 2 4 Piping and Instrumentation Diagram 2800 3600 GPD...
Страница 16: ...16 Figure 2 5 Piping and Instrumentation Diagram 2800 3600 GPD with Optional 20 Micron Prefilter...
Страница 17: ...17 Figure 2 6 Piping and Instrumentation Diagram 4800 6200 GPD...
Страница 18: ...18 Figure 2 7 Piping and Instrumentation Diagram 4800 6200 GPD with Optional 20 Micron Prefilter...
Страница 33: ...33 Figure 2 28 Hose Tube Connection Instructions Figure 2 29 Tubing Fitting Internals...
Страница 64: ...64 8 DRAWINGS DIAGRAMS...
Страница 65: ...65 1 P ID...
Страница 66: ...66...
Страница 67: ...67...
Страница 68: ...68...
Страница 69: ...69 2 GA Drawing...
Страница 70: ...70...
Страница 71: ...71...
Страница 72: ...72...
Страница 73: ...73...
Страница 74: ...74...
Страница 77: ...77 4 Wiring Diagrams...
Страница 78: ...78...
Страница 79: ...79...
Страница 80: ...80...
Страница 81: ...81...