![Paradyne iMarc SLV 9820-2M Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/paradyne/imarc-slv-9820-2m/imarc-slv-9820-2m_installation-instructions-manual_3806059003.webp)
3
Package Checklist
Verify that your package contains the following:
❑
iMarc SLV unit
❑
Universal power supply with an attached cable and ferrite choke
❑
Power cord appropriate for the wall-plug standard in your country (depends on
model ordered).
❑
Ferrite choke (9820-2M only)
Be sure to register your warranty at
www.paradyne.com/warranty
.
Preparation
If you ordered a wall mounting kit (Feature No. 9001-F1-891) for your iMarc unit, install
the wall mounting before you start installing the unit. Follow the same guidelines below
when installing the wall mounting. Contact your sales representative to order this
feature.
Before starting the installation, make sure you have:
❑
A dedicated, grounded power outlet that is protected by a circuit breaker within
6 feet of the iMarc unit.
❑
A clean, well-lit, and ventilated site that is free from environmental extremes.
❑
One to two feet of clearance for cable connections.
❑
A physical connection to the frame relay network via an NTU, with either an
EIA-530-A, V.35, or X.21 user interface. This connection is made using the
appropriate cable attached to the Network port of the iMarc unit.
This cable is not supplied with your iMarc unit, and you will need to order the
appropriate cable kit for your application, V.35, X.21, or EIA-530-A (see
on page 4 for the Feature No. you need to order).
❑
An async (asynchronous) terminal or PC (personal computer) to set up the
access unit.
❑
Node IP Addresses and Subnet Masks (see your network administrator).
See the appropriate manual for additional information:
Troubleshooting: see the
iMarc Operations Guide
Technical Specifications, Connectors, Cables, and Pin Assignments: see the
iMarc
Technical Description