2. Installation
8610-A2-GN20-10
April 2001
2-5
Hotwire 8610 DSLAM Chassis Installation
The Hotwire 8610 DSLAM chassis is designed to be stacked one on top of the
other on a desktop or table, or mounted in a 19-or 23-inch rack (front or center
mount). Up to three 8610 chassis can be stacked on a table or desktop. Mounting
brackets are provided for mounting in 19- or 23-inch racks.
You will need a large flat-blade screwdriver and a Phillips screwdriver to install the
8610 chassis in a commercial EIA-standard 19- or 23-inch rack. You will need a
small Phillips screwdriver to change the STACK POSITION switch.
Stacking the 8610 Chassis
Procedure
To stack the Hotwire 8610 DSLAM chassis on a desktop or table, select the stack
position, and interconnect the stack:
1. Place the first 8610 chassis on a desktop or table.
2. Place the second 8610 chassis directly on top of the first chassis.
3. Place the third 8610 chassis directly on top of the second chassis.
4. Change the setting of the rotary STACK POSITION switch to the appropriate
position of the chassis using a small Phillips screwdriver. Examine the switch
closely to be sure the switch is set so that the notch points to the position
number.
— The base chassis
containing the MCP
card must be set to
Stack Position 1.
— The chassis directly on
top of the base chassis
must be set to Stack
Position 2.
— The chassis directly on
top of the second
chassis must be set to
Stack Position 3.
— Start a second stack for
chassis four through six
with the Stack Position
switch set appropriately.
TM
TM
ST
AC
K
PO
SI
TI
ON
2
3
6
5
4
1
AC
IN
PU
T
1
2
3
ES
D
ES
D
48
VD
C
CL
AS
S
2
OR
L
IM
IT
ED
PW
R
SO
UR
CE
48
V
A
RT
N
A
B
B
A
B
DC
F
US
ES
T4
A,
M
IN
. 4
8V
PW
R
A
AL
M
FA
N
B
OU
T
IN
SE
RI
AL
AL
M
IN
TF
M
CP
/1
2
3
M
CP
/
DS
L
M
AN
AG
EM
EN
T
10
B
AS
E
T
86
10
TM
TM
ST
AC
K
PO
SI
TI
ON
2
3
6
5
4
1
AC
IN
PU
T
1
2
3
ES
D
ES
D
48
VD
C
CL
AS
S
2
OR
L
IM
IT
ED
PW
R
SO
UR
CE
48
V
A
RT
N
A
B
B
A
B
DC
F
US
ES
T4
A,
M
IN
. 4
8V
PW
R
A
AL
M
FA
N
B
OU
T
IN
SE
RI
AL
AL
M
IN
TF
M
CP
/1
2
3
M
CP
/
DS
L
M
AN
AG
EM
EN
T
10
B
AS
E
T
86
10
TM
TM
ST
AC
K
PO
SI
TI
ON
2
3
6
5
4
1
AC
IN
PU
T
1
2
3
ES
D
ES
D
48
VD
C
CL
AS
S
2
OR
L
IM
IT
ED
PW
R
SO
UR
CE
48
V
A
RT
N
A
B
B
A
B
DC
F
US
ES
T4
A,
M
IN
. 4
8V
PW
R
A
AL
M
FA
N
B
OU
T
IN
SE
RI
AL
AL
M
IN
TF
M
CP
/1
2
3
M
CP
/
DS
L
M
AN
AG
EM
EN
T
10
B
AS
E
T
86
10
99-16312-01
Base Unit
Stack Position 1
Stack
Position 2
Stack
Position 3
4
6
.
.
.
3
.
1
2
POSITION
STACK
5
4
6
.
.
.
3
.
1
2
POSITION
STACK
5
4
6
.
.
.
3
.
1
2
POSITION
STACK
5
Содержание HOTWIRE 8610 DSLAM
Страница 1: ...Hotwire 8610 DSLAM Installation Guide Document No 8610 A2 GN20 10 April 2001...
Страница 6: ...E April 2001 8610 A2 GN20 10...
Страница 12: ...About This Guide vi April 2001 8610 A2 GN20 10...
Страница 34: ...2 Installation 2 18 April 2001 8610 A2 GN20 10...
Страница 44: ...4 Troubleshooting 4 4 April 2001 8610 A2 GN20 10...
Страница 54: ...Glossary GL 4 April 2001 8610 A2 GN20 10...