Troubleshooting
11-15
9124-A2-GH30-00
June 1999 - Preliminary
Test Timeout
A Test Timeout feature is available to automatically terminate a test (as opposed
to manually terminating a test) after it has been running a specified period of
time.
It is recommended that this feature be used when the
FrameSaver unit is
remotely managed through an inband data stream (PVC). If a test is accidently
commanded to execute on the interface providing management access, control is
regained when the specified time period expires, automatically terminating the
test.
To use this feature, enable the Test Timeout configuration option, and set a
duration for the test to run in the Test Duration (min) configuration option (see
Configuring General System Options
in Chapter 8,
Configuration Options).
NOTE:
These configuration options do not pertain to tests commanded by the DTE,
like a DTE-initiated External Loopback.
Содержание FrameSaver SLV 9124
Страница 1: ...FrameSaverr SLV 9124 TECHNICAL REFERENCE Document No 9124 A2 GH30 00 June 1999 PRELIMINARY DRAFT ...
Страница 22: ...About the FrameSaver SLV 1 8 9124 A2 GH30 00 June 1999 Preliminary This page intentionally left blank ...
Страница 200: ...Configuration 8 78 9124 A2 GH30 00 June 1999 Preliminary This page intentionally left blank ...
Страница 286: ...Menu Hierarchy A 4 9124 A2 GH30 00 June 1999 Preliminary This page intentionally left blank ...
Страница 330: ...Cables Connectors and Pin Assignments D 10 9124 A2 GH30 00 June 1999 Preliminary This page intentionally left blank ...
Страница 346: ...Index IN 12 9124 A2 GH30 00 June 1999 This page intentionally left blank ...