1. Installation
4821-A2-GN20-00
April 2002
1-9
2. Place the BitStorm 4800 so that the brackets rest against the front of the rails.
Insert screws in the bottom screw positions and hand-tighten them.
3. Insert and tighten the screws in the top screw positions, then tighten the
bottom screws.
4. Do not plug in the unit. Proceed to
Installing the Management Module
02-17071
OK
ALARM
TEST
1
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
47
2
4
6
8
1
7
MGMT
CONSOLE
MODEM
ALARM
V.35/X.21
3
5
3
5
7
11
13
15
17
19
9
21
23
25
27
29
31
33
35
37
39
41
43
45
OK
ALARM
TEST
1
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
47
2
4
6
8
STACK POSITIO
N
1
7
MGMT
CONSOLE
MODEM
ALARM
V.35/X.21
UPLINK
GigE
DOWN LINK
GigE
3
5
3
5
7
11
13
15
17
19
9
21
23
25
27
29
31
33
35
37
39
41
43
45
4804
4821
UPLINK
GigE
DOWNLINK
GigE
STACK POSITION
Содержание BitStorm 4800 Express
Страница 1: ...BitStorm 4800 Installation Guide Document No 4821 A2 GN20 00 April 2002 ...
Страница 48: ...4 Configuration 4 6 April 2002 4821 A2 GN20 00 ...
Страница 60: ...A Connectors Cables and Pin Assignments A 12 April 2002 4821 A2 GN20 00 ...
Страница 68: ...Index IN 4 April 2002 4821 A2 GN20 00 ...