4821-A2-GN20-00
April 2002
1-1
1
Installation
Preparation
Consider the following before installing the BitStorm™ 4800:
Installation Site
Your installation site should be well ventilated, clean, and free of
environmental extremes.
Installation Options
The BitStorm 4800 may be:
— Mounted with the included mounting brackets in a standard 483 mm (19
″
)
or 584 mm (23
″
) rack, or, with separately purchased mounting brackets, in
a 535 mm (21
″
) ETSI or 610 mm (24
″
) EIA rack. ETSI brackets are
available from Paradyne. See
.
As many BitStorm 4800 units may be mounted in a standard rack as there
are 44.45 mm (1.75
″
) spaces in the rack, so long as adequate cooling is
provided.
— Mounted vertically against a wall.
The standard mounting brackets provided can be fastened to the base of
the unit for wall mounting.
— Set on a shelf or desktop.
Up to eight BitStorm 4800 units may be stacked on a shelf or desktop.
Management Module
A 4800 or 4804 Management Module must be installed in each BitStorm 4800.
Power
The BitStorm 4800 operates from a standard AC power supply (90 to
264 VAC at 47 to 63 Hz).
Fiber Optic Uplink and Downlink
Use of either of the fiber optic ports requires use of a Small Form-factor
Pluggable (SFP) transceiver, not included. It must be compliant with the SFP
Transceiver MultiSource Agreement of September 14, 2000, and provide a
1000BaseX interface.
Other Cabling
With the exception of the power cord, no cables are provided with the
BitStorm 4800. See
on page 1-2 to determine what cables
you need to procure before installation.
Содержание BitStorm 4800 Express
Страница 1: ...BitStorm 4800 Installation Guide Document No 4821 A2 GN20 00 April 2002 ...
Страница 48: ...4 Configuration 4 6 April 2002 4821 A2 GN20 00 ...
Страница 60: ...A Connectors Cables and Pin Assignments A 12 April 2002 4821 A2 GN20 00 ...
Страница 68: ...Index IN 4 April 2002 4821 A2 GN20 00 ...