![Panduit smartzone U01N11L Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/panduit/smartzone-u01n11l/smartzone-u01n11l_installation-manual_3603814024.webp)
SMARTZONE UPS INSTALLATION MANUAL
23
Figure 24: Secure the Mounting Brackets to the Rack
Install 3U EBP Unit (UVP240)
It is recommended to install the EBP unit directly under the UPS unit. It is recommended
to install all subsequent EBP units directly under the previous EBP unit.
1. Install the URMKIT2 rail kit:
a. Install the front side of the rail kit with 2x Phillips Pan Head M5 screws (see
figure below) on each rail. Do not tighten the screws.
Figure 25: Install the Front Side of Rails
b. Adjust the rail size according to the depth of the rack
c. Install the rear side of the rail kit with 3x Phillips Pan Head M5 screws (see
figure below) on each rail.