PVIQ™ CONNECTIVITY SYSTEM USER MANUAL V 1.0
119
Figure 93: PViQ™ Connectivity Panel Installation
NOTE: The provided screws must be used to guarantee a good ground connection
between panels/trays for proper operation of the PViQ™ Connectivity System.
Figure 94: Alternate Acceptable Mounting Screws
Jack Module Installation
After the PViQ™ Connectivity Panel is secured to the rack or cabinet, the next step is to
install terminated jack modules into the patch panel. In this PViQ™ Connectivity System
configuration (one PM connected to three EMs), 96 jacks are needed, although the
PViQ™ Connectivity System does not require a jack in every port.