![Panduit Smartzone PViQ Connectivity System Скачать руководство пользователя страница 106](http://html1.mh-extra.com/html/panduit/smartzone-pviq-connectivity-system/smartzone-pviq-connectivity-system_user-manual_3458906106.webp)
PVIQ™ CONNECTIVITY SYSTEM USER MANUAL V 1.0
105
Figure 73: Target Port when MAC is Complete
IMPORTANT NOTE: If the user removes one end of the I-Cord from the patch panel
without issuing a work order, a Secure Violation occurs. Simply inserting the I-Cord
back into the port will NOT remove the violation in the SmartZone Software. The user
MUST perform the provisioning process again.
Enhanced I-Cord Connection – Incorrect Switch Port
The previous scenario demonstrates the steps of connecting an Enhanced I-Cord as
they would occur if perfectly executed. The procedure in this section demonstrates what
would occur in a common failure scenario – in this case, a technician plugs the LED end
of the Enhanced I-Cord into an incorrect switch port.
1. After a Move, Add, or Change (MAC) order has been issued, the PM Interface
Unit MAC LED lights solid green, and the MODE LED flashes green.
Figure 74: PM IU in MAC Mode