PVIQ™ CONNECTIVITY SYSTEM USER MANUAL V 1.0
102
Figure 63: Target Port during a Guided Add
6. Remove the I-Cord from the PM Provisioning Port. The MODE LED turns off.
Figure 64: PM IU during a Guided Add (moving from provisioning port to
target port)
7. Connect the I-Cord to the designated port on the PViQ™ Patch Panel.
The MAC LED turns off, the MODE LED changes to green briefly, then the panel
returns to Secure Mode if the MAC is complete on this panel. The Port LED turns
off.
Figure 65: PM IU and Port when MAC is Complete
Enhanced I-Cord Connection
Perform the following procedure to make connections using the Enhanced PViQ™ I-
Cord.
1. After a Move, Add, or Change (MAC) order has been issued, the PM Interface
Unit MAC LED lights solid green, and the MODE LED flashes green.