8.2. Sleeper Lifting Operation
If a sleeper is more than about 10 mm low, a sleeper
lifting operation is required.
1. Release the dead-mans-handle and let the work
head be lowered so that the shoes reach down to the
sleeper level.
2. Active the clipping cycle.
3. When the shoes are locked onto the back of the clips
and have stopped moving, grab the dead-mans-
handle and the sleeper will be lifted up towards the
rail.
4. When the sleeper is lifted, the clipping operation will
be completed automatically.
5. Move on to the next sleeper and repeat the
sequence if necessary.
Fig 76.
Fig 77.
Ì
NOTE!
FASTCLIPS secure the rail to the sleepers
and are therefore a key element of the
railway infrastructure. It is very important
that operators and supervision staff
• Check that clipping/de-clipping shoes have
been correctly adjusted as described in this
manual.
• Check that the installed clips have not been
damaged during installation and that they
have been properly installed in accordance
to recommendations from Pandrol UK Ltd.
Содержание CD200 IQ
Страница 1: ...Partners in excellence ENG_OMM_CD200IQ_P03 2023 03 16 CD200 IQ OPERATION AND MAINTENANCE MANUAL...
Страница 2: ...2 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...
Страница 53: ...53 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...
Страница 80: ...80 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...
Страница 81: ...81 av 82 OPERATION AND MAINTENANCE MANUAL I ENG_OMM_CD200IQ_P03 I 2023 03 16 Pandrol 2023...