background image

Network Board

Operating Instructions

Model No.

WJ-PB65E01

Video Output Board 1 Only

Nework OUT X-1

ALARM OUT 1

ALARM OUT 2

10/100 BASE-T

Before attempting to connect or operate this product, please read these instructions carefully and save this manual for future use.

Along with this document, refer to Central Processing Unit
WJ-MPU955A Operating Instructions for major operating

References

controls, their functions, and switch settings.

Preface

Network Board WJ-PB65E01 is designed for the connection
with Central Processing Unit WJ-MPU955A and system

expansion of Matrix Switcher WJ-SX650 Series.

Trademarks and Registered Trademarks

• Microsoft and Windows are either registered trade-

marks or trademarks of Microsoft Corporation in the
United States and/or other countries.

• Intel and Pentium are trademarks or registered trade-

marks of Intel Corporation or its subsidiaries in the
United States and other countries.

• Other names of companies and products contained in

these operating instructions may be trademarks or reg-
istered trademarks of their respective owners. 

CAUTION:

These servicing instructions are for use by qual-

ified service personnel only. To reduce the risk of elec-
tric shock do not perform any servicing other than that
contained in the operating instructions unless you are
qualified to do so.

• Do not attempt to disassemble the apparatus.

To prevent electric shock, do not remove screws or
covers.
There are no user-serviceable parts inside. Contact
qualified service personnel for maintenance.

Precautions

• Do not strike or give a strong shock to the appara-

tus.

It may cause damage or allow water to enter the appa-
ratus.

• Pay attention to static electricity

Make certain to keep boards inside the anti-static sack
until it is installed.
Put your hand on a metallic surface, other than the
boards to discharge static electricity before installation.
Do not touch components mounted on the boards
directly by hand.
Hold only both edges of the boards when installing.

Содержание WJ-PB65E01

Страница 1: ...ed States and other countries Other names of companies and products contained in these operating instructions may be trademarks or reg istered trademarks of their respective owners CAUTION These servicing instructions are for use by qual ified service personnel only To reduce the risk of elec tric shock do not perform any servicing other than that contained in the operating instructions unless you...

Страница 2: ...650 Series Operating Instructions for the ALARM OUT port details Pin Nos 3 5 7 9 12 14 16 18 36 and 37 are unavailable e VS Input Connector VS IN Accepts a VS input signal from an external device r VS Output Loop thru Connector VS OUT THRU Loops through VS input signals supplied to e t VS Output Connector VS OUT Supplies VS output signals to external devices While e is accepting a VS input signal ...

Страница 3: ...side by pushing down the board stoppers and by fix ing the screws Then attach the front panel Note When mounting insert the main board surely into slits Matrix Switcher WJ SX650 OPERATE Video output main board Fixing brackets x4 Screws x8 SIGNAL GND SIGNAL GND TERM ON ON MODE TERM OFF MODE DATA 4 HDR4 T MNL8 HDR2 T MNL4 DATA 3 HDR3 T MNL7 HDR1 T MNL3 DATA 2 TMNL6 TMNL2 DATA 1 TMNL5 TMNL1 P S DATA ...

Страница 4: ...n Note In the factory default installation C Program Files Panasonic Firmware is created and files will be copied to the directory Uninstallation 1 Select Control Panel Add Remove Programs Add Remove Programs window will be displayed on the PC screen 2 Select Firmware version up software Click Remove or Change Remove and follow the directions Note If the Firmware update software has already been i...

Страница 5: ...ing directory E PWriter SX650_vXXXXX_yyyy mot E is the CD ROM drive X is the software version and y is the checksum Note Make a note of version displayed in the File Selection window The version will be required for checking in Step 7 6 Connect the SERIAL port of WJ SX650 Series and PC Refer to the illustration of SERIAL port in p 4 Then perform the firmware update by following the instructions gi...

Страница 6: ...u the user can change the Ethernet communica tion properly Factory default Auto Negotiation Installation and Uninstallation Installation 1 Insert the supplied CD ROM into the CD ROM drive on the PC 2 Double click setup exe in the Setup_Tool folder of CD ROM The installation wizard will be displayed on the PC screen 3 Follow the instruction message on the PC screen to complete the installation Note...

Страница 7: ...ed Note If you upload the setting data from the PC to WJ SX650 Series while SETUP MENU is open on a monitor SETUP MENU will be closed forcibly Settings per formed in SETUP MENU will be canceled and replaced by those uploaded from the PC Window Details Tool Bar q Downloads the current setup data of WJ SX650 Series to the PC w Uploads the setup data configured in WJ SX650 Series Initial Setup Tool f...

Страница 8: ...anasonic Canada Inc 5770 Ambler Drive Mississauga Ontario L4W 2T3 Canada 905 624 5010 http www panasonic ca Panasonic Sales Company Division of Panasonic Puerto Rico Inc San Gabriel Industrial Park 65th Infantry Ave KM 9 5 Carolina P R 00985 809 750 4300 Panasonic System Solutions Company Unit Company of Panasonic Corporation of North America Security Systems www panasonic com security For custome...

Отзывы: