Page 3-18
Machine Adjustment
3-4-3
Board Transport
This is used to check the state of the board being transported between each conveyor and move it
to the different positions.
UNLOCK
+ Carry in
Transports the board in from the previous
process to the conveyor (left). Ready signal is
transmitted to the previous process.
UNLOCK
+ Load
Transports the board from the conveyor (left) to
the board holder.
UNLOCK
+ Unload
Transports the board from the board holder to
the conveyor (right).
UNLOCK
+ Carry out
Transport the board from the conveyor (right)
out to the next process.
UNLOCK
+ Positioning action
Performs only the board positioning motion.
UNLOCK
+ Holder to origin
Returns the support to its origin.
UNLOCK
+ Rear
Moves the board holder to the rear side.
UNLOCK
+ Front
Moves the board holder to the front side.
UNLOCK
+
Clamps/Releases the board when the board
holder has been moved to the front or rear
side.
Image of conveyor
Green image
Indicates the board is on the current con-
veyor.
After the board has been transported, the
color of this position turns off and the image
that had been blinking turns in green.
Image blinking in green
Indicates the conveyor that is the next
destination of the board.
PCB clamp
1E4C-E-OMA03-A02-01
PCB clamp
Содержание SP28P
Страница 2: ......
Страница 6: ...4 1E4C E OMA00 B01 00 MEMO...
Страница 14: ...12 1E4C E OMA00 A02 01 MEMO...
Страница 64: ...Page 1 12 MEMO 1E4C E OMA01 A02 01...
Страница 78: ...Page 2 14 MEMO 1E4C E OMA02 A01 01...